1)  mass curve
土方曲线
2)  mass haule curve
土方曲线
3)  earthwork
土方
1.
The application of earthwork balance and environment protection in the construction of new village;
土方平衡与环境保护在新农村建设中的运用
2.
Application of wash-out gun to excavation of earthwork;
水枪冲土在土方开挖工程中的应用
3.
The quality of construction for backfill in earthwork is not easy to control in the rain spell .
土方工程雨期回填施工质量不易保证,是土方工程施工中较为棘手的难题。
4)  earthwork excavation
土方开挖
1.
The earthwork excavation of the foundation pit project was excavated with 3 layess with depths of-4.
软土地基下基坑土方开挖分三层开挖(-4。
5)  Drainage rock method
排土方法
6)  piping package earthwork
管袋土方
1.
Pinghu Beach Reclamation Project from Baishawan to Shuikou is the first one carried out by the combination of piping package earthwork and pavement structure,the main part of which has been finished after 2 years construction.
平湖市白沙湾至水口治江围涂工程是浙江省第一个以管袋土方结合护面结构型式的围垦工程。
7)  earthwork construction
土方施工
1.
This paper states some treatment methods and relevant precautions of groundwater in earthwork construction.
论述了在土方施工中几种地下水处理的方法及注意事项。
2.
According to the project purpose classification cupability target of earth and the mechanism to densification earth in earthpower science,this paper briefly discusses that the earth hydrous ratio densification function and drought density are taken as the importance of quality control earthwork principle in thedike earthwork construction.
依据土的工程用途分类的特性指标和土力学中对土体压实的机制,简述了堤坝土方施工中以土料含水率、压实功能和干密度为质量控制重点的土工原理。
3.
Taking earthwork construction of a power plant soft soil foundation as a example,it introduces earthwork constructing method and announcements of soft soil foundation,and summarizes its constructing experience,practice proves that formulating scientific and rational constructing scheme is a reliable way of safely high quality finishing engineering item.
以某电厂软土地基的土方施工为例,介绍了软土地基的土方施工方法和注意事项,并对其施工经验进行了总结,实践证明,制定科学合理的施工方案,是安全、优质完成工程项目的可靠途径。
8)  earthwork allocation
土方调配
1.
In order to save the transporting costs of earthwork allocation reasonably, linear programming and MATLAB software are used to calculate earthwork allocation accurately and rapidly.
为了合理节约土方调配的运输费用,采用线性规划的方法,使用MATLAB软件,准确、快速地进行土方调配计算,并且通过南水北调中线一期工程总干渠安阳段第七施工标段土方调配的工程实例,说明该法的具体应用,得出应用线性规划进行土方平衡调配,可以找出最优的方案,降低施工成本,提高经济效益。
9)  closure earthwork
闭气土方
1.
Technical research on accelerating consolidation of sea embankment closure earthwork;
海堤闭气土方加速固结应用技术研究
10)  earth excavation
土方开挖
1.
Foundation pit support and earth excavation of underground garage in a certain residential engineering;
某住宅工程地下车库基坑支护及土方开挖
2.
On earth excavation and support scheme;
浅谈土方开挖及支护方案
3.
Comparisons on economical and optimal plans of earth excavation;
浅谈土方开挖方案经济优化的比较
补充资料:土方
土方 土方   地区性民间使用的简便方药。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条