1) earthwork calculation
土方计算
1.
Application of geostatistical interpolation method to earthwork calculation;
地统计克立格插值法在工程土方计算中的应用
2.
In order to resolve these problems,this paper introduces a new method of earthwork calculation based on DTM,including treatment of grid points,delaunay triangulation and re-triangulation for the combined original terrain,designed surface and grid points, as well as earthwork calculation from each triangle pairs.
针对传统的方格网计算方法精度不高,其成果的表现力不理想等问题,介绍了基于三角网数模(DTM)进行土方计算的思路,主要包括土方计算散点坐标文件的生成、土方量的计算和土方量统计的原理和实现方法,并利用M FC和O b jectARX技术完成了相应的程序开发。
3.
It’s well known that the earthwork calculation in ditch design is tediousand important.
渠道设计中的土方计算,烦琐而又必要。
2) earthwork calculation
土方量计算
1.
Development of MATLAB toolbox applied to earthwork calculation;
土方量计算的MATLAB工具箱研制
2.
There are some different methods for earthwork calculation,such as square grid,section,contour,DEM method,and so on.
为计算高阜工业园区的土方量,采用方格网法;并重点讨论在不同地形坡度下,得到的不同土方量计算结果;最后根据测区需要,做出合理选择。
3.
There are many algorithms of earthwork calculation.
土方量计算有多种算法。
3) earthworks computation
土石方计算
1.
The paper analyzed several influenced factors of subgrade earthworks computation for expressway.
对影响高速公路路基土石方计算的几个主要因素进行分析,参照实例讨论如何准确、合理地进行土石方数量的计算与调配。
5) earthworks calculation
土石方量计算
1.
Taking Dacheng-Liugezhuang 110 kV transmission line engineering as an example,of which were constructed recently by the transmission line and substation engineering company,designing idea and method for VEP program are introduced in combination with the program of earthworks calculation designed by the article writer.
以送变电工程公司最近施工的项目“大城—留各庄110 kV线路工程”为例,结合作者最近编制的土石方量计算程序介绍了VEP程序的设计思路及方法。
6) earthwork volume and count
土方测量与计算
补充资料:洪水调节计算(见水库调洪计算)
洪水调节计算(见水库调洪计算)
hongshui tiaojie洪水调节计算J ISUan 见水库调洪计算。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条