1) earthwork water tight
土方闭气
1.
The first stage of Xiaoshan Reclamation Engineering solved the two key problems in Qiantangjiang strong tide area with low river-bed which is always near deep-water region: one is deep water jackstone in strong tide rush area;the other is gap closure and earthwork water tight.
一是攻克了在强涌潮顶冲地段进行深水抛坝的难题;二是同样在强涌潮顶冲地段完成龙口封堵和土方闭气施工。
2) closure earthwork
闭气土方
1.
Technical research on accelerating consolidation of sea embankment closure earthwork;
海堤闭气土方加速固结应用技术研究
3) obturation pattern
闭气方式
1.
There are four types of obturation pattern suitable for wedge breechblock.
适用于楔式炮闩的闭气方式有4种类型。
4) rustic dialect
土里土气的方言
5) air closure
闭气
1.
The construction measures of "air closure first and then river closure" are adopted which makes the construction period to be shortened over a month.
滩坑水电站筑坝施工防渗墙施工不留龙口,实施先闭气后截流的导截流施工方案,使工期提前1个多月。
6) qi blockage
气闭
补充资料:闭气
闭气
water tight
biqi闭气(water tight)在堵口工程合龙后,采取阻水断流措施,阻止缝隙漏水。 用立堵法合龙,当合龙绿尚未蛰实,坝身仍然漏水,坝后翻花不止,大小远近不一,应辨明是底漏还是腰漏,如是底漏,说明绿体尚未到底,比较严重。闭气方法,一般有:①在正坝堵合后,除合龙蹄上加压土外,于口门坝前加修绿工,称为关门端。然后抛袋土及加修土俄,使之闭气;②双坝合龙时,用边坝合龙闭气,在正坝与边坝之间,用袋土及粘土填筑土柜,边坝之后再加后战,阻止透水;③修筑养水盆,即在坝后修筑围堤一道,把门口冲深的潭坑围起来,用以积蓄坝后渗水,抬高坝后水位与大河相平,即可闭气。对平堵的口门,因抛石渗漏严重,须采用①、②两种闭气办法,截堵渗流。(徐福龄)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条