1) excavation and dredging
土方干挖
2) cut,excavation,excavation earth
挖土,挖方
3) earthwork excavation
土方开挖
1.
The earthwork excavation of the foundation pit project was excavated with 3 layess with depths of-4.
软土地基下基坑土方开挖分三层开挖(-4。
4) earth excavation
土方开挖
1.
Foundation pit support and earth excavation of underground garage in a certain residential engineering;
某住宅工程地下车库基坑支护及土方开挖
2.
On earth excavation and support scheme;
浅谈土方开挖及支护方案
3.
Comparisons on economical and optimal plans of earth excavation;
浅谈土方开挖方案经济优化的比较
5) earth and stone digging
土方挖掘
6) soil excavation
土方开挖
1.
Considering of the post-pouring concrete strain of the building,the suitable enclosure structure,the technology of curtain for cutting off water,soil excavation method was chosen and strengthening the construction monitoring to induced the harmful influence to the surroundings around the pit.
深基坑工程长近百米,周边环境复杂,施工作业条件差,结合工程设计留设的后浇带,采用适合的支护结构体系、止水帷幕技术、土方开挖方法,加强施工监测,着力于减少对周边环境的不利影响,为类似条件的深基坑工程的施工提供了有益的经验。
2.
Engineers made rational construction plans such as soil excavation methods,routes and supports, improved construction monitoring, adopted information construction methods, and finally successfully ensured safe construction of the foundation pit.
通过制定合理的土方开挖方法、路线和支撑施工方案 ,加强施工监测 ,运用信息化施工 ,保证了基坑的安全运
3.
The construction yard around the foundation excavation support engineering of the third stage of Wangfuyuan project is narrow,so there is no place around foundation pit for material stacking and material treating,and it is difficult for soil excavation and transportation.
王府园三期基坑支护工程周边施工场地狭小,为解决地下室施工时基坑周边无材料堆放场地、加工场地及基坑大量土体同时开挖外运困难等问题,在第1层角撑四周设置材料堆场及操作平台、在基坑第1、2道对撑位置设置了栈桥,进而改善了土方场内运输条件,提高了土方开挖外运的效率,缩短了工期,节约了工程造价。
补充资料:大型土方工程施工
大型土方工程施工
大型土方工程施工
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条