1)  prefabricated building
预制装配式房屋
2)  prefabrication
预制
1.
Quality control in production of oil tank's prefabrication;
石油储罐预制生产中的质量控制
2.
Analysis of the prefabrication construction technology of 35m short box-girder;
浅析35m矮箱梁预制施工工艺
3.
Brief Introduction of Prefabrication and Lifting Process for Box Type Arch Bridge in Yuanmo Expressway,Yunnan;
云南元磨高速公路箱形拱桥预制吊装施工简介
3)  prefabricate
预制
1.
This article through carries on the analysis to the Fu-Chao highway roadbed T-beam prefabricated situation,summarizes T-beam to prefabricate in the process the common question as well as the preventive measure,only supplies the reference.
本文通过对阜朝高速公路路基T梁的预制情况进行分析,总结出T梁预制过程中常见的问题以及预防措施,仅供参考。
2.
9m tube used in Guangzhou Pearl River Tunnel is prefabricated by movable moulding bed in dry dock site.
9m 管节,采用整体移动式钢模台车,在干坞中预制。
3.
In order to know the character of them,the contact between them and the crack, and their forming process,we designed a special experiment- prefabricate crack in the shaped blank.
为了弄清此类异质颗粒的性质及其与裂纹之间的联系,以及具有该相同特征的裂纹组织的形成过程,特设计预制裂纹实验方案进行验证,通过试验研究,发现了异质颗粒的性质及其与裂纹之间的联系,判断出具有该相同特征的裂纹组织的形成过程,总结出了影响异质颗粒形成及大小的主要因素。
4)  Prefabricated
预制
1.
The prefabricated construction technology of 40m T beam at tropical weather;
热带气候条件下40m T梁预制施工技术
2.
Through a case of Shanghai Rail Line 11 (north section part I), the design plan and construction technique of prefabricated box girder were summarized and compared in this paper, which have gained valuable experience about similar projects.
通过上海市轨道交通11号线北段一期工程的实践,对轨道交通预制轨道箱梁的设计方案和施工工艺进行了简要的归纳和对比,并进行了分析,为预制轨道箱梁的设计和施工积累了一定的经验。
3.
As one of the most significant structure forms in modern architecture,prefabricated concrete structure has the advantages of saving material and labor,improving construction efficiency,accelerating construction speed and lifting construction quality.
预制混凝土结构是现代建筑最重要的结构形式之一,具有节约材料和劳动力,提高施工工效,加快施工进度,提高建筑工程的产品质量等优势。
5)  Precast
预制
1.
Capacities of Headed Stud Shear Connectors in Composite Steel Beams with Precast Hollowcore Slabs;
对组合钢梁-预制空心板中栓钉连接件的性能分析
2.
Study on performance of precast glass fiber concrete composite pavement slab under static loading;
预制玻璃钢-砼复合路面板的静力性能研究
3.
Study on construction techniques of precast box girder for passenger special line;
客运专线箱梁预制施工技术研究
6)  precasting
预制
1.
Determination of workday consumption for full span box girder precasting;
整孔箱梁预制消耗工天测定
2.
Matters needing attention in T-beam precasting;
T梁预制中需要注意的问题
3.
Precasting and Construction Techniques of 40m PPC Box Girder of Wuhu Yangtze River Bridge;
芜湖长江大桥40m PPC箱梁预制及架设技术
参考词条
补充资料:装配式衬砌
      用在工厂或工地预制的构件拼装而成的隧道衬砌。装配式衬砌与整体式(模筑)衬砌比较,可以减轻工人的劳动强度,节约劳动力,降低建筑材料消耗和提高衬砌质量。一般地说,装配式衬砌的造价较低,施工进度也较快。由于衬砌拼装就位后,几乎就能够立即承重,拼装工作可以紧接隧道开挖面进行,因而缩短了坑道开挖后毛洞的暴露时间,使地层压力不致过大;而且不用临时支撑,有助于机械化快速施工和工业化生产。采用装配式衬砌是地下工程的发展方向之一。
  
  圆形隧道装配式衬砌的结构材料有混凝土、钢筋混凝土、铸铁、铸钢、钢板和混凝土等。钢筋混凝土管片衬砌(见图)的构件形式,有箱形管片和板形管片。素混凝土衬砌则多做成刚性砌块。砌块最适用于较小直径或含水量较低的稳定地层内,各块间接缝的防水需要妥善处理。砌块式结构的施工拼装速度快,费用较低。管片则适用于不稳定地层各种直径的隧道内,其纵向和环向管片间都通过螺栓相联结,中间设置防水层嵌缝,防水性能较有保证;但拼装速度降低,施工费用增加。单线地下铁道的装配式管片衬砌环一般可分为6~8块;双线地下铁道可分为8~10块构件;小断面隧道可只分为4~6块构件。分块原则要考虑结构的柔性和防水要求,并根据管片的制作、运输和安装等方面的因素确定,使管片尺寸和拼装都达到高精度。拱顶处设置封顶管片。由于施工方便和受力需要,趋向于采用径向楔入或纵向插入式的封顶管片。
  
  
  管片衬砌各环间的纵向联结方式有通缝和错缝两种。所有衬砌环的纵缝对齐的称为通缝;而环间纵缝互相错开,犹如砖砌体一样的称为错缝。通缝拼装方便,但错缝的整体性较好。砌块间接头用球铰式、榫槽式或销钉式等;管片间接头则由双排或单排螺栓联结。为增加结构柔度,采用位于断面三分之一处的单排螺栓居多。接头防水是装配式衬砌的关键问题,除要求管片制作保证精度,以尽量消除初始缝隙外,接头本身要有防水措施。当采用多道防水接头构造时,其第一道为防水密封垫,具有良好的弹性变形性能;第二道为内侧嵌缝槽,最好在隧道变形已趋基本稳定时再做;必要时可再添设第三道灌浆孔,待隧道变形稳定后进行灌浆。实际工程视重要性而采取一道至多道防水措施。
  
  在用盾构法施工的圆形隧道中,广泛采用了装配式管片衬砌。在施工阶段作为临时支撑使用,并承受盾构千斤顶顶力和其他施工荷载;竣工后则作为永久性承重结构,并防止泥水渗入。必要时可在其内部灌筑混凝土或钢筋混凝土内衬,以提高隧道的防水能力,修正施工误差,并起装饰作用。
  
  在用矿山法施工的隧道中,当地质条件允许并有施工场地和相应的机械设备时,也可采用装配式衬砌。马蹄形装配式衬砌,可由数块管片或砌块拼装而成。还有采用石块砌筑边墙,顶拱用一整块半圆拱或两块三铰拱构件组成直墙拱形衬砌。
  
  用明挖法施工的地下结构,更适于采用装配式衬砌。当具有一定的运输和吊装能力时,对无水地层或解决好接头防水措施后,都可以大力推广。也可以先装配内层为一次衬砌,再以它为模板,在其外层再灌筑一层现浇衬砌。此外,采用结构装配而接头为现场灌筑的装配-整体式衬砌,在保证防水条件下,可以增大结构的整体刚度。
  
  装配式衬砌结构,除承受岩土地层压力等荷载以外,还须验算构件运输和拼装时的施工受力条件。结构计算应考虑接头刚度对衬砌受力和变形的影响。土质隧道的装配式衬砌,设置接头以后结构变柔,使沿衬砌周边的地层压力分布趋于均匀,可以改善衬砌受力性能,降低材料消耗。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。