1)  panel-type house
预制墙板式房屋
2)  prefabrication
预制
1.
Quality control in production of oil tank's prefabrication;
石油储罐预制生产中的质量控制
2.
Analysis of the prefabrication construction technology of 35m short box-girder;
浅析35m矮箱梁预制施工工艺
3.
Brief Introduction of Prefabrication and Lifting Process for Box Type Arch Bridge in Yuanmo Expressway,Yunnan;
云南元磨高速公路箱形拱桥预制吊装施工简介
3)  prefabricate
预制
1.
This article through carries on the analysis to the Fu-Chao highway roadbed T-beam prefabricated situation,summarizes T-beam to prefabricate in the process the common question as well as the preventive measure,only supplies the reference.
本文通过对阜朝高速公路路基T梁的预制情况进行分析,总结出T梁预制过程中常见的问题以及预防措施,仅供参考。
2.
9m tube used in Guangzhou Pearl River Tunnel is prefabricated by movable moulding bed in dry dock site.
9m 管节,采用整体移动式钢模台车,在干坞中预制。
3.
In order to know the character of them,the contact between them and the crack, and their forming process,we designed a special experiment- prefabricate crack in the shaped blank.
为了弄清此类异质颗粒的性质及其与裂纹之间的联系,以及具有该相同特征的裂纹组织的形成过程,特设计预制裂纹实验方案进行验证,通过试验研究,发现了异质颗粒的性质及其与裂纹之间的联系,判断出具有该相同特征的裂纹组织的形成过程,总结出了影响异质颗粒形成及大小的主要因素。
4)  Prefabricated
预制
1.
The prefabricated construction technology of 40m T beam at tropical weather;
热带气候条件下40m T梁预制施工技术
2.
Through a case of Shanghai Rail Line 11 (north section part I), the design plan and construction technique of prefabricated box girder were summarized and compared in this paper, which have gained valuable experience about similar projects.
通过上海市轨道交通11号线北段一期工程的实践,对轨道交通预制轨道箱梁的设计方案和施工工艺进行了简要的归纳和对比,并进行了分析,为预制轨道箱梁的设计和施工积累了一定的经验。
3.
As one of the most significant structure forms in modern architecture,prefabricated concrete structure has the advantages of saving material and labor,improving construction efficiency,accelerating construction speed and lifting construction quality.
预制混凝土结构是现代建筑最重要的结构形式之一,具有节约材料和劳动力,提高施工工效,加快施工进度,提高建筑工程的产品质量等优势。
5)  Precast
预制
1.
Capacities of Headed Stud Shear Connectors in Composite Steel Beams with Precast Hollowcore Slabs;
对组合钢梁-预制空心板中栓钉连接件的性能分析
2.
Study on performance of precast glass fiber concrete composite pavement slab under static loading;
预制玻璃钢-砼复合路面板的静力性能研究
3.
Study on construction techniques of precast box girder for passenger special line;
客运专线箱梁预制施工技术研究
6)  precasting
预制
1.
Determination of workday consumption for full span box girder precasting;
整孔箱梁预制消耗工天测定
2.
Matters needing attention in T-beam precasting;
T梁预制中需要注意的问题
3.
Precasting and Construction Techniques of 40m PPC Box Girder of Wuhu Yangtze River Bridge;
芜湖长江大桥40m PPC箱梁预制及架设技术
参考词条
补充资料:预制混凝土墙板
      在预制厂(场)或建筑工地加工制成供建筑装配用的加筋混凝土板型构件,简称墙板或壁板。采用预制混凝土墙板建造装配式大板建筑,可以提高工厂化、机械化施工程度,减少现场湿作业,节约现场用工,克服季节影响,缩短建筑施工周期。
  
  分类  按使用功能分为内墙板和外墙板两大类。
  
  ①内墙板。有横墙板、纵墙板和隔墙板三种。横墙板与纵墙板均为承重墙板,隔墙板为非承重墙板。内墙板应具有隔声与防火的功能。内墙板一般采用单一材料(普通混凝土、硅酸盐混凝土或轻集料混凝土)制成,有实心与空心两种。
  
  ②外墙板。有正面外墙板、山墙板和檐墙板三种。正面外墙板为自承重墙板,山墙板与檐墙板为承重墙板。外墙板除应具有隔声与防火的功能外,还应具有隔热保温、抗渗、抗冻融、防碳化等作用和满足建筑艺术装饰的要求,外墙板可用轻集料单一材料制成,也可采用复合材料(结构层、保温隔热层和饰面层)制成。
  
  生产工艺  在已制作好的模具内进行加工预制混凝土墙板,可分为清理模板、涂隔离剂、模内布筋、灌筑混凝土、振动成型、养护、拆模、检验、成品堆放和运输等工序。其方法有平模生产和立模生产两种。按生产工艺分为台座法、平模机组流水法、平模传送流水法和成组立模或成对立模法四种。
  
  ①台座法。墙板在一个固定的地点成型和养护。布筋、成型、养护和拆模等工序所需的一切材料和设备都供应到墙板成型处。
  
  ②平模机组流水法。墙板在若干个工位上制造,当在一个工位上完成一道或数道工序之后,利用起重运输设备把墙板运至下一个工位。由于每一个工序没有固定的停留时间,因而也没有固定的生产节拍。
  
  ③平模传送流水法。把生产过程分成若干工序,每个工序顺次地在生产线上的一个固定工位上进行,被加工的墙板按一定的时间节拍在生产线上顺序地向前移动。
  
  ④成组立模或成对立模法。墙板在垂直位置成组或成对地进行生产。通过模外设备进行振动成型并采用模腔通热,进行密闭热养护。这种方法所需时间短,占地面积小,生产效率高,但只能生产单一材料的墙板。
  
  外墙板饰面工艺  可分为装饰混凝土、灌筑中完成饰面层和后做饰面层三种。
  
  ①装饰混凝土。将混凝土外墙板浇制成带各种造型线条、凹凸花纹的面层或将脱模后的表面经过特定处理后作成装饰面层。从方法上又分为本色混凝土饰面和二次后加工饰面两种,都不需要另做饰面层。
  
  ②灌筑中完成饰面层。在混凝土灌筑前或灌筑后作特殊装饰性处理的饰面层并与预制工序同时进行,使二者结合成为一个整体。
  
  ③后做饰面层。制成混凝土外墙板后再做表面饰面层。
  
  展望  中国从1958年在北京建成了第一栋预制混凝土墙板住宅以来,预制混凝土墙板工业发展迅速。采用预制混凝土墙板建造全装配式和装配整体式大板建筑,已成为中国向建筑工业化发展的途径之一。随着建筑工业化水平的不断提高,外墙板饰面应尽量采用装饰混凝土或灌筑中完成饰面层的工艺,以加快工程速度。
  