1) Cut under Cover(Top Down)Method
盖挖逆作法(CCTDM)
2) cover-excavation reverse method
盖挖逆作法
1.
Construction technology of the subway station by using the cover-excavation reverse method under the complex environment;
复杂环境下盖挖逆作法地铁车站修建技术
3) topdown construction
盖挖逆作法施工
1.
The application of dual-purpose pile in topdown construction can not only save costs,but also make the mechanic condition of substructure walls more rational.
在盖挖逆作法施工中采用"一桩两用"技术,不仅可节约大量费用,而且使地下结构的外墙的受力状态更为合理。
4) cover and excavation top-down
盖挖逆作
1.
On the construction technique of the cover and excavation top-down method in the reconstruction project for Suzhou railway station
苏州火车站改造工程盖挖逆作法施工技术
5) technique with covered excavation and inverted ma sonry
盖挖逆筑法
6) integrated covered top down method
盖挖-逆作一体化
补充资料:暗挖法
见隧道及地下工程施工方法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条