说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 明挖逆作法
1)  topdown construction method
明挖逆作法
1.
The techniques of topdown construction method for air shaft of metro line
地铁中间风井超深基坑明挖逆作法施工技术
2)  cover-excavation reverse method
盖挖逆作法
1.
Construction technology of the subway station by using the cover-excavation reverse method under the complex environment;
复杂环境下盖挖逆作法地铁车站修建技术
3)  open cut method
明挖顺作法
1.
With some subway station foundation pit engineering as example,the construction planning and procedure of foundation pit excavation with open cut method were detail introduced.
以某地铁车站基坑工程为例,详细介绍了采用明挖顺作法进行基坑土方开挖的施工方案及工序,阐述了基坑土方开挖与支撑及桩间喷射混凝土施工的技术措施,从而确保基坑周边土体变形在设计允许值内,以实现安全施工。
4)  topdown construction
盖挖逆作法施工
1.
The application of dual-purpose pile in topdown construction can not only save costs,but also make the mechanic condition of substructure walls more rational.
在盖挖逆作法施工中采用"一桩两用"技术,不仅可节约大量费用,而且使地下结构的外墙的受力状态更为合理。
5)  Cut under Cover(Top Down)Method
盖挖逆作法(CCTDM)
6)  top-down excavation
逆作开挖
1.
Deflection controlling measures and practices of deep foundation pits by use of top-down excavation method;
逆作开挖深基坑控制卸载变形的方法与实践
补充资料:暗挖法
      见隧道及地下工程施工方法。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条