说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 盖挖法
1)  Covered excavation
盖挖法
1.
A covered excavation was adopted, which not only eliminated the problem of traffic blockage but also protected the adjacent buildings and services above the foundation pit, with much shorter construction period.
通道采用了盖挖法施工 ,既解决了地面全断面行车 ,又确保基坑上部管线及邻近建筑物的安全 ,减少了基坑施工周期。
2.
Combined with shallow tunnel of Maoshan west tunnel,this paper compares the covered excavation with open-cut method on technology and economy.
并对盖挖法施工方案及施工工艺进行了介绍。
2)  cover-cut method
盖挖法
1.
A new type of cover-cut method is successfully applied to construction of the rail transit station in the soft ground of Shanghai, which uses the standard and modulus recyclable and reusable temporary pavement system in the soft ground area, with the first support of reinforced concrete also for the support structure of the temporary pavement.
软土地区采用标准化、模数化的可回收重复利用临时路面系统和首道支撑采用钢筋混凝土兼作临时路面支承结构的新型盖挖法,在上海轨道交通车站建设中获得成功。
2.
This paper presents the method for construction load determination in cover-cut method.
研究表明盖板全铺设施工导致的建筑底板附加沉降量最大,较非盖挖法大21%;盖板全铺设施工对坑底隆起控制能力最强,开挖完成后坑底隆起较非盖挖法小7。
3.
Based on characteristics of shallow-buried portal section and adjacent existing buildings,cover-cut method is adopted in Houyuntai Mountain Tunnel.
针对后云台山隧道右线洞口段埋深浅、邻近既有建筑物的特点,采用盖挖法施工。
3)  top-down method
盖挖法
1.
Discussion on the top-down method of the foundation support technology;
浅谈盖挖法基坑支护技术
4)  excavation after covering
盖挖工法
5)  Semi-covered excavation method
半盖挖法
6)  covered excavation and sequential method
盖挖顺做法
补充资料:暗挖法
      见隧道及地下工程施工方法。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条