说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 一次扣拱暗挖逆作法
1)  top-down bored excavation with cast-in-situ arch
一次扣拱暗挖逆作法
1.
On the basis of analysing traditional tunneling methods and engineering practice,a new technology of top-down bored excavation with cast-in-situ arch for large-scale underground projects is put forward.
通过对传统暗挖工法的解析,结合工程实践,提出一种新的用于修建大型地下建筑工程的暗挖工法——一次扣拱暗挖逆作法,阐述新工法的技术核心和要点,在北京地铁黄庄站的实践,以及应用发展前景。
2)  cover-excavation reverse method
盖挖逆作法
1.
Construction technology of the subway station by using the cover-excavation reverse method under the complex environment;
复杂环境下盖挖逆作法地铁车站修建技术
3)  topdown construction method
明挖逆作法
1.
The techniques of topdown construction method for air shaft of metro line
地铁中间风井超深基坑明挖逆作法施工技术
4)  integrated covered top down method
盖挖-逆作一体化
5)  topdown construction
盖挖逆作法施工
1.
The application of dual-purpose pile in topdown construction can not only save costs,but also make the mechanic condition of substructure walls more rational.
在盖挖逆作法施工中采用"一桩两用"技术,不仅可节约大量费用,而且使地下结构的外墙的受力状态更为合理。
6)  Cut under Cover(Top Down)Method
盖挖逆作法(CCTDM)
补充资料:暗挖法
      见隧道及地下工程施工方法。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条