说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 深立井施工
1)  deep standing well construction
深立井施工
1.
The paper introduces applied content and result in order to offer reference to deep standing well construction during drainage.
淄博矿业集团济北矿区唐口矿风井井筒深度1044m,在选择施工期间排水方案时,为了克服吊泵事故率高、维修不方便、投资大等缺点,改为吊盘上安装卧泵排水,取得了比较理想的效果,主要介绍了方案确定、具体实施内容及效果,可供处理大涌水量的深立井施工期间排水参考。
2)  deep mine shaft construction
深井施工
1.
Design and material selection on drilling tools of raising boring machine for deep mine shaft construction;
深井施工用反井钻机钻具的选材和设计
3)  vertical shaft construction
立井施工
1.
This paper introduces the technology and application of synchronous concentrated control of several steady vehicles in vertical shaft construction, which has solved the dissynchromous consentrated control problem of steady vehicles and achieved great effect in vertical shaft construction.
本文介绍了立井施工中多台稳车同步集中控制技术及其应用,解决了稳车不能同步集中控制的问题,在立井井筒施工方面取得了良好的效果。
2.
Taking the vertical shaft construction of Qianfogou Coal Mine as the example, this paper introduces in detail the technology of slide template, and puts forward some matters needing attention in the construction.
以千佛沟矿排矸立井施工为例,详细介绍了滑动模板筑壁的工艺,提出了施工中的注意事项。
4)  shaft construction
立井施工
1.
This article illustrates the critical role of mechanical-electro management from the sides of new technology, smart equipment and management in shaft construction.
从使用新工艺、新设备 ,加强设备的维护管理等方面说明了机电管理在煤矿立井施工中的举足轻重作用 ,具有较大的指导作
2.
The risk of shaft construction is analyzed by using safety system engineering method.
本文以安全系统工程的方法分析立井施工中的风险,对危险源进行辩识和评价,找出立井施工期间安全控制的原则及所依据的理论,可为立井施工的安全管理提供参考。
3.
This paper introduces three methods in vehicle control during the shaft construction,and points out the usage and shortcomings of electronic control system consisting of a single,centralized control with multiple relays,buttons and other conventional electrical components.
本文介绍了立井施工中稳车控制的3种方法,指出了单台、多台集控以继电器、按钮等常规电器元件构成的电控系统在现场实践中的使用和其缺陷。
5)  Deep well Construction
深水井施工
6)  mine shaft construction speed
立井施工速度
1.
In order to improve the cut blasting rate of mine shaft deep borehole, to reduce the blasting material consumption and the circu- lated blasting operation time and to speed up the mine shaft construction speed, an applied study on the cut borehole diameter, depth, section number and initiating time difference and other parameters was conducted for the cut of two-section and three-section.
为了提高立井深孔掏槽爆破效率,减少爆破器材消耗量和循环钻爆作业时间,加快立井施工速度。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条