说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 线型规划
1)  linear programming
线型规划
1.
In this paper,as an example of Baihetan hydropower station engineering,a linear programming model of water-rock reaction is established,and complex hydrogeology condition in the dam area is quantitatively analyzed and evaluated from geochemistry aspect.
采用水-岩作用线型规划的模拟方法,以白鹤滩水电工程为实例,从水化学方面对坝区复杂水文地质条件作定量分析评价。
2.
In this paper, a linear programming model of water-rock reactions established and is applied to the analysis and appraisal of complex hydrogeology condition of Baihetan power station as an example from geochemistry.
采用水—岩作用线型规划的模拟方法,以白鹤滩水电工程为实例,从水化学方面对坝区复杂水文地质条件作定量分析评价。
2)  nonlinear programming model
非线性规划模型
1.
On the basis of analysing basic differential equation of natural gas rapid percolation in porous media,establishes nonlinear programming model to extract equation coefficient A,B,C.
本文在分析天然气在多孔介质中高速渗流基本微分方程物理意义的基础上,采用建立非线性规划模型求解方程系数A、B、C,并用交会法确定绝对无阻流量。
3)  linear programming model
线性规划模型
1.
A regional linear programming model with technological,economic and resource constraints was established to carry out optimal analysis on wastewater reuse potential in China.
 为比较我国不同地区再生水利用量的差异和考察水价变化对再生水利用量的影响,建立了一个在技术、经济和资源约束下的区域污水再生利用潜力线性规划模型,对我国的再生水利用量进行了优化分析。
2.
Objective The purpose of this study is to estimate and forecast the minimum consumption expenditure on food of 8 provinces using linear programming model.
方法使用线性规划模型估计和预测的目标人群是18~49岁不同体力活动水平的男、女成年人,研究使用的软件工具为GAMS语言程序。
3.
A new method was adapted to linear programming models for multi reservoir system, based on the maximum weighted flood volume delivered at each time according to reality of Xiaoqing River basin.
揭示出库群防洪调度中防洪权重随净雨量变化而变化的规律 ,并按照水库每时刻预留防洪库容加权总和最大的准则 ,建立了水库群系统防洪联合调度的线性规划模型 ,采用改进的仿射变换法进行求解 ,并在小清河流域的水库群系统调度中加以应用。
4)  linear planning model
线性规划模型
1.
Application of linear planning model in production proportioning process;
线性规划模型在氧化铝生产配料工艺中的应用
2.
Based on the contradiction between the need of the public fire protection equipment and the available fund in the city fire planning,two types of linear planning models with synthesized assessment of the public fire protection equipment and optimized construction fund have been put forward.
针对城市消防规划中公共消防设施建设项目的需求量与可利用建设资金之间的矛盾,提出了基于公共消防设施建设项目综合评估和建设资金优化的两类线性规划模型,并进行了实例分析。
5)  exact linear programming
确定型线性规划
6)  off-line lay-out design
离线型规划设计
补充资料:城市总体规划与国土规划、区域规划的关系

国土规划、区域规划、城市总体规划是在不同层次、涉及不同地域范围的发展规划。国土规划、区域规划、城市总体规划组成一个完整的规划系列,国土规划和区域规划应当是城市总体规划的重要依据。而全国和区域性的江河流域、土地利用等专业规划则是国土和区域规划的重要组成部分,城市土地利用规划又是城市总体规划的重要组成部分。
我国的国土规划、区域规划以及江河流域规划、区域性土地利用总体规划等工作起步较晚,目前正在有计划、有重点地逐步展开,还没有法定的审批程序和审批成果。而全国绝大多数城市总体规划已经各级政府按法定程序审批,并在不断完善和深化,在实际工作中存在着相互联系和交叉的情况,因此本法原则确定应当相互协调的关系是必要的。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条