说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 井筒施工
1.
The application of Frequency Control on Steady Vehicles Group in Shaft Construction
稳车群变频调速在井筒施工中的应用
2.
Increasing Blasting Efficiency of Frozen Rock and Speedingup Shaft Construction
提高冻结基岩爆破效率 加快立井井筒施工速度
3.
Experience on the shrink shaft drilling construction reserve period
缩短立井井筒凿井施工准备期的经验
4.
The Simple Study of Rapid Construction of Auxiliary Shaft in EightBao Coal Mine
八宝煤矿副井井筒快速施工作业浅析
5.
Discussion on Working Platform Arrangement Pattern in Vertical Shaft Construction
立井井筒装备施工吊盘布置方式探讨
6.
Construction technology for auxiliary shaft crosscut in huerxinhe coal mine
霍尔辛赫煤矿副井井筒揭煤施工技术
7.
Vertical Shaft Aquifer Surface Advance Grouting Engineering Technique
立井井筒含水层地面预注浆施工技术
8.
Stress Analysis for Cemented CNG Storage Well and Its Construction Process
全井筒固井储气井应力分析及施工工艺
9.
The ConstructionAnalysis of Anti-Well Method Through Falling Soft Rock Section
反井法施工立井井筒过软岩垮落段实践分析
10.
Rapid Construction Technology of Freezing Well-wide Shaft of New Shanghai No.1 Ventilation Shaft Mine
新上海一号矿风井全井冻结井筒快速施工技术
11.
On the Configuration of Mechanized Construction Equipment of 1000 Meters Wellbore
浅谈千米井筒机械化施工设备的配置
12.
Construction techniques of shaft water control by sanding and grouting at hydrostatic level
静水抛砂注浆治理井筒突水施工技术
13.
Safe And Quick Construction with High-quality of Auxiliary Inclined Shaft in Xiegou Coal Mine
斜沟煤矿副斜井井筒安全优质快速施工
14.
The Construction Methods of the Outside Tube Wall withφ17.80M under the Tower Shaft in Dragon Mine
龙家堡煤矿主井井塔筒形基础施工方法
15.
The Construction Program of Exposing Deep Seam of in Main Shaft Coal of HU Jia-River Mine
胡家河煤矿主井井筒揭露深厚煤层施工方案
16.
New Ideas and Construction Practice Concerning Air Shaft Material in the Compressible Layer
立井井筒可缩层选材的新思路与施工实践
17.
Deep Alluvium Mine Shaft Drilling Construction Method
深厚冲积层煤矿井筒钻井法施工的探讨
18.
Application of information construction technology in the deep shaft freezing method
信息化施工在深井井筒冻结中的应用研究