1) cover-excavation reverse method
盖挖逆作法
1.
Construction technology of the subway station by using the cover-excavation reverse method under the complex environment;
复杂环境下盖挖逆作法地铁车站修建技术
2) topdown construction
盖挖逆作法施工
1.
The application of dual-purpose pile in topdown construction can not only save costs,but also make the mechanic condition of substructure walls more rational.
在盖挖逆作法施工中采用"一桩两用"技术,不仅可节约大量费用,而且使地下结构的外墙的受力状态更为合理。
3) Cut under Cover(Top Down)Method
盖挖逆作法(CCTDM)
4) cover and excavation top-down
盖挖逆作
1.
On the construction technique of the cover and excavation top-down method in the reconstruction project for Suzhou railway station
苏州火车站改造工程盖挖逆作法施工技术
5) technique with covered excavation and inverted ma sonry
盖挖逆筑法
6) integrated covered top down method
盖挖-逆作一体化
补充资料:暗挖法
见隧道及地下工程施工方法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条