1) dam heightening works
大坝加高工程
1.
Rope-saw cutting to restore transverse joints before Danjiangkou dam heightening works;
丹江口大坝加高工程中用绳锯切割恢复横缝施工
2.
The comprehensive development planning of Danjiangkou Hydraulic Project,general layout of the first-phase project and the main hydraulic structures are described;the second-phase dam heightening works and the major social-economic benefits of Danjiangkou Hydraulic Project are described emphatically.
介绍了丹江口水利枢纽的开发规划初期工程的枢纽布置及主要建筑物;重点介绍了续建计划中的大坝加高工程及水利枢纽主要的社会经济效益。
2) Danjiangkou Dam heightening project
丹江口大坝加高工程
1.
The paper discusses the technology requirement,construction programs,methods and quality control measures on construction of jointing old and new concrete in Danjiangkou dam heightening project of Middle Line of the South-to-North Water Transfer Project.
论述了南水北调中线水源工程丹江口大坝加高工程贴坡新老混凝土结合施工的技术要求、施工程序、施工方法及质量控制措施等。
2.
In dam base widening excavation construction of left bank of Danjiangkou dam heightening project, it is essential not to produce crack by blasting in old dam body to ensure dam safety, especially to ensure normal operation plant and other equipments.
在丹江口大坝加高工程左岸坝段扩大基础开挖施工中,除了要防止老坝体混凝土因爆破产生裂缝外,还要保证大坝的安全运行,特别是电厂及相关设备的正常运行,因此采用了控制爆破施工技术,并加强了对爆破过程中的安全监测和立体安全防护工作,取得了较好的效果。
3) dam heightening
大坝加高
1.
Influence of Danjiangkou dam heightening on monitoring system and solutions;
丹江口大坝加高对监测系统的影响及对策
2.
Construction scheme of concrete cohesion in Danjiangkou dam heightening works;
丹江口大坝加高工程新老混凝土结合施工方案
3.
Heightening the Danjiangkou Dam is the largest dam heightening project.
丹江口大坝加高工程是国内最大的大坝加高续建工程,初期工程建成运行至今已有30多年,表层混凝土已出现了不同程度的老化,新老混凝土结合面处理时必须将老混凝土碳化层全部进行凿除。
4) High Dams
高坝工程
1.
The Finite Element and Genetic Algorithm Used for Seepage Inverse Problem of High Dams;
采用遗传算法和有限元法进行高坝工程渗流反问题研究
5) the Daguangba project
大广坝工程
6) Gaobazhou Project
高坝洲工程
1.
Test study on polymer cement mortar for anti-seepage in RCC dam section of Gaobazhou Project;
高坝洲工程RCC坝段防渗聚合物砂浆试验研究
补充资料:大坝、水库工程特别除外责任条款
大坝、水库工程特别除外责任条款
[大坝、水库工程特别除外责任条款]涉外建筑工程保险中承保大坝、水库建筑工程的除外责任条款。承保大坝、水库工程,必须附加本条款。根据该条款规定,对下列费用或损失均不负赔偿责任:软石地段灌水泥浆或采取的特别安全措施;排水费用;系统的机器损坏;防止地下水的绝缘或其他装置;被保险人未能及时采取相应措施而导致坡度腐蚀的处理费用;滑坡;基础不实引起的地陷、裂口或渗漏。