1) heightening project
加高工程
1.
Research on the Problems of Bounding State between Fresh and Old Concrete in the Dan Jiangkou Dam Heightening Project;
丹江口大坝加高工程新老混凝土结合问题研究
2) Plastic Processing and engineering
高聚物加工工程
3) heightening and extension works
加高扩建工程
4) dam heightening works
大坝加高工程
1.
Rope-saw cutting to restore transverse joints before Danjiangkou dam heightening works;
丹江口大坝加高工程中用绳锯切割恢复横缝施工
2.
The comprehensive development planning of Danjiangkou Hydraulic Project,general layout of the first-phase project and the main hydraulic structures are described;the second-phase dam heightening works and the major social-economic benefits of Danjiangkou Hydraulic Project are described emphatically.
介绍了丹江口水利枢纽的开发规划初期工程的枢纽布置及主要建筑物;重点介绍了续建计划中的大坝加高工程及水利枢纽主要的社会经济效益。
5) polymer reactions and modification
高分子材料加工工程
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)
坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle
一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条