2) The section below the Gezhouba Dam
葛洲坝水利枢纽下游江段
3) Gezhouba project
葛洲坝
1.
Overview of cascade operation of the Three Gorges Project in cofferdam power generation period with Gezhouba project;
三峡-葛洲坝水利枢纽围堰发电期梯级调度研究与实践回顾
2.
Research on the influence of unsteady flow produced by operation of TGP on navigation Ⅲ: Lower Yichang reach of Gezhouba project;
三峡水利枢纽工程非恒定流通航影响研究 Ⅲ:葛洲坝下游宜昌河段
3.
Maintenance and Repair of Gates and Hoists of Gezhouba Project;
葛洲坝水工闸门和启闭机械维护检修
4) Gezhouba
葛洲坝
1.
Research of 3-D digital simulation platform for TGP and Gezhouba cascade dispatching;
三峡与葛洲坝梯级调度三维数字仿真平台开发
2.
Hydrological modal of chinese sturgeon s spawning site at lower reach of Gezhouba Hydroproject;
葛洲坝下游中华鲟产卵场的水文学模型
3.
Operation analysis of the line protection in Ge-Chen line of 220 kV Gezhouba switchyard;
葛洲坝220kV开关站葛陈线线路保护动作行为分析
5) Gezhouba Dam
葛洲坝
1.
An observation on water current profiles of spawning of Acipenser sinensis downward Gezhouba Dam;
葛洲坝下中华鲟自然繁殖流速场的初步观测
2.
Variations in spawning stock structure of Acipenser sinensis within 24 years since damming of Gezhouba Dam;
葛洲坝截流24年来中华鲟产卵群体结构的变化
3.
The closure of the Gezhouba Dam cut off much of the spawning area for Chinese sturgeon,which endangered the species.
葛洲坝和三峡工程对水生生物的栖息地造成了一定影响,中华鲟栖息地严重萎缩。
6) Sanjiang Channel downstream Gezhouba Dam
葛洲坝三江下航道
1.
The result shows that the plan of submerged groin can meet the demands of navigation water level of Sanjiang Channel downstream Gezhouba Dam,during the diffirent construction periods of the Three Groges Project.
结果表明,潜坝方案能够满足三峡不同运用阶段的葛洲坝三江下航道通航水位要求,该方案经济可行,效果显著。
补充资料:忠洲坝
忠洲坝
Chungju Dam
概 述
忠洲坝位于韩国的南汉(Namhan)江上,流域面积为6648km2,是一座混凝土重力坝,坝高98m,坝长464m,坝顶高程147.5m,总库容为27.5亿m3,有效库容为17.89亿m3,水库面积97km2,设计洪水位为145m,正常蓄水位为141m,死水位为110m,装机容量为40万kW,年发电量为7.6亿kW·h,年供水量33.8亿m3。1978年6月开工,1986年6月完工。