1) Gaobazhou hydropower plant
高坝洲电厂
1.
Improvement on fixing seal strips of hydroturbine guide-vane of Gaobazhou Hydropower Plant
高坝洲电厂水轮机导叶密封安装方法改进
2.
Reform on upper guide bearing supports of generator No.2 of Gaobazhou Hydropower Plant
高坝洲电厂2号机组上导瓦支撑改造
3.
The idea about enterprise culture of Gaobazhou hydropower plant is interpreted through the analysis on its formation,that is,high start,high standard and high efficiency;strict demands,strict discipline and strict style;harmonious public relation;beautiful environment.
通过对高坝洲电厂企业文化形成的分析,解读了高坝洲电厂“三高三严一和一美”的企业文化理念。
2) Gaobazhou Hydropower Plant
高坝洲水电厂
1.
Review on technical reform of Gaobazhou Hydropower Plant
高坝洲水电厂技术改造工作回顾
3) Caobazhou water supply works
高坝洲水厂
4) Gezhouba Hydropower Plant
葛洲坝电厂
1.
Large-size bolts assembling and disassembling in hydroturbine maintenance of Gezhouba Hydropower Plant
葛洲坝电厂水轮机检修中的大型螺栓拆装
2.
Implementation of New Efficient Operation Management Mode in the Gezhouba Hydropower Plant
新型高效运行管理模式在葛洲坝电厂的实施
5) Erjiang power plant
葛洲坝二江电厂
1.
Discussion on and Implementation of Upgrading of Computer Supervisory Control System of the Erjiang power plant of Gezhouba Hydropower Station;
葛洲坝二江电厂监控系统升级改造的实施与探讨
6) Gezhouba Dajiang Hydropower Plant
葛洲坝大江电厂
1.
Review of the Development Course of Computer Monitoring System of Gezhouba Dajiang Hydropower Plant;
葛洲坝大江电厂计算机监控系统发展过程回眸
补充资料:IGCC电厂(见整体煤气化联合循环电厂)
IGCC电厂(见整体煤气化联合循环电厂)
Aintegrated gasification combined cycle plant
IGCC电厂bined eyele(integrated gasifieationConl一plant)见整体煤气化联合循环电厂。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。