1)  The report of comprehensive planning
“规划”
2)  planning
规划
1.
Study on General Contingency Planning of Regional Oil Spill Incident with Related Equipment Base;
区域溢油应急设备库总体规划研究
2.
Planning Methods of Ecological Restoration for Coal Mining Area in China and Its Case Study;
中国煤矿区生态修复规划的方法与实例
3.
Study on production engineering measure planning;
采油工程措施规划方法研究
3)  plan
规划
1.
The plan for the development of Zhejiang Province papermaking industry during the“ 11th Five-year Plan”;
浙江省造纸行业“十一五”发展规划
2.
Research on the 11th Five-Year Plan for SO_2 Pollution Control of Existing Coal-Fired Power Plants;
现有燃煤电厂二氧化硫治理“十一五”规划研究
3.
Environment protection while constructing Heilongjiang electric power network under' the 11th five-year plan';
“十一五”规划蓝图下的黑龙江省电网建设环境保护
4)  programming
规划
1.
Influential Factors Analysis and Countermeasures of Environmental Sanitation Programming of Small Towns;
小城镇环卫规划影响因素分析与对策
2.
Suggestion on index system construction for programming environmental impact assessment;
关于规划环评指标体系建设的建议
3.
The technique of whole processing management for medical equipment(1)—programming;
医疗设备全程管理技术(一)——医疗设备的装备规划和立项
5)  program
规划
1.
Research on Non-quantification Factors of Garbage Disposal Program;
垃圾处理规划的非量化因素研究
2.
Formulating the Eleventh Five-year Program of hospital growth with the guidance of a scientific approach to development;
以科学发展观为指导 编制医院十一·五发展规划
6)  layout
规划
1.
Urban integrated park modification and replacement layout design discussion;
城市综合性公园改造与更新规划设计初探
2.
Extensive management phenomena analysis in the design and layout stage of the medium and small-sized cities;
中小型城市设计规划阶段粗放管理现象浅析
3.
Research of controlling layout design for expanding engineering of Hefei Arboretum;
合肥植物园扩建工程控制性规划设计研究
参考词条
补充资料:《北美电力可靠性协会规划标准》


《北美电力可靠性协会规划标准》
North American Elec-tric Reliability Coun-cil planning standard

  保证电力系统稳定性和可靠性的关键元件。这些控制必须与发电机保护配合,以尽量减少在不正常电压、电流和颇率造成的扰动情况下发电机跳闸。发电机励磁控制是电力系统动态电压控制的重要方法,因此励磁设备(励磁机、电压调整器和电力系统稳定器)良好的运行性能,对电力系统稳定是重要的。原动机控制(调速器)是系统频率调整的主要方法。发电机控制和保护必须设计得既能使发电机在不正常情况下支持互联电力系统又能恰当地保护发电设备使之不致损坏。 (4)自动低频减负荷。自动低频减负荷对防止全系统崩演,保护发电和物电设施免受损坏,提供合理的减负荷和保证互联系统的可靠性有重要作用。因此各区域应制定自动低频减负荷方案(包括低频解列方案),并应与相邻区域的方案、发电机控制和保护系统、自动低压减负荷方案,区域负荷恢复方案及翰电保护和控制系统相配合。还应注意是否会引起过频率、过电压或拍电线过负荷,并采取适当的措施。 (5)自动低压减负荷。电压不稳定能造成发电机和枪电设施的跳闸,其结果是失去用户负荷,甚至导致系统崩溃。由于电压崩溃可能突然发生,使调度人员没有足够的时间稳定系统,因此在系统一部分中装设自动低压减负荷装置可能是稳定互联系统和防止电压崩演的一项有效措施。因此自动低压减负荷方案必须由各区域制定并在实施中与相邻区域协调。此外,所有低压减负荷方案应与发电机控制和保护系统,自动低颇减负荷方案,区城负荷恢复方案和翰电保护和控制方案相配合。还应注意是否会引起过频率、过电压或翰电线过负荷,并采取相应的措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。