1) total weighted completion time
加权完工时间和
1.
This paper considers the problem of scheduling n jobs on m parallel unbounded batch machines to minimize the total weighted completion time.
考虑无界批量机器并行调度中极小化加权完工时间和问题。
2.
The objective function is to minimize total weighted completion time.
讨论了2台机器调整时间可分离的FlowShop排序问题,目标函数为极小化加权完工时间和。
2) total weighted completion time
加权总完工时间
1.
This paper discusses the stochastic scheduling on a single machine to minimize total weighted completion time subject to precedence constraints of chains.
研究具有链式约束的单机随机排序问题,目标函数为加权总完工时间的数学期望。
4) expected total weighted completion time
期望总加权完工时间
5) the total weighted completed time
极小化加权总完工时间
1.
The problem of minimizing the total weighted completed time on single batch processing machine is studied.
讨论了单机分批排序问题中目标是极小化加权总完工时间的问题。
6) discounted total weighted completion time
折扣加权总完工时间
1.
Discounted Total Weighted Completion Time in No-Wait Flow Shop with Separated Setup Times;
折扣加权总完工时间的调整时间可分离无等待Flow Shop排序问题
2.
We considered the scheduling problem with the objective of minimizing the discounted total weighted completion time.
本文讨论了目标函数为折扣加权总完工时间的调度问题。
补充资料:因侵害姓名权、肖像权、名誉权、荣誉权产生的索赔权
因侵害姓名权、肖像权、名誉权、荣誉权产生的索赔权:公民、法人的姓名权、名称权,名誉权、荣誉权、受到侵害的有权要求停止侵害,恢复名誉,消除影响,赔礼道歉,并可以要求赔偿损失。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条