说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 折扣加权总完工时间
1.
A Semi-Online Algorithm for Solving the Single Machine Scheduling Problem to Minimize Total Weighted Completion Time with Discounted Factor
折扣加权总完工时间问题的半在线排序算法
2.
The Parallel Batch Scheduling Problem with Family Jobs and Equal Processing Time to Minimize the Weighted Total Completion Time
加工时间相同的分族分批排序加权总完工时间问题
3.
Single Machine Scheduling Problem with Minimizing Weighted Completion Times with Resource Constrained;
资源有限的加权总完工时间单机排序问题
4.
An Unbounded Batch Scheduling Problem with Incompatbile Job Families to Minimize the Weighted Total Completion Time
一类无界的不相容工件族分批排序加权总完工时间问题
5.
Discrete Time Markov Decision Model with Discounted Multi rewards Weighted and Lexicographically Order Criteria;
离散时间折扣多目标马氏决策模型:加权与字典序准则
6.
The problem of minimizing the total weighted completed time on single batch processing machine is studied.
讨论了单机分批排序问题中目标是极小化加权总完工时间的问题。
7.
Dynamic Programming Algorithm on Two Machines Cross Docking Scheduling with Total Weighted Completion Time;
以总加权完工时间为目标的两台机越库排序的动态规划算法
8.
Minimizing total weighted completion time in semiresumable case of single-machine scheduling with an availability constraint
带不可用时间段的部分可续型单机加权完工时间和调度
9.
A Batching Scheduling Algorithm for Maximizing Total Weigted Number of Jobs Completed in Due Date Window;
交货时间区间内加权完工工件个数最大的分批排序算法
10.
An Experimental Study on Delayed Discounting Effect of Time Versus Money;
时间VS.金钱的延迟折扣效应研究
11.
I'll finish the job, no matter how long it takes.
不管花多少时间,我总要完成这项工作。
12.
According to the law, the purchasers enjoy the rights of housing reform and late spouse seniority discount.
依照法律政策,购房人享有房改购房权、工龄折扣权、已故配偶工龄折扣权。
13.
Discount broking in the internet age has become “commoditised”.
折扣经纪服务在网络时代已经完全平价商品化。
14.
Analysis of Heuristic Algorithm for the Flexible Flow Shop Weighted Completion Time Scheduling Problem;
柔性Flow shop加权完成时间调度问题的启发式算法
15.
Design and Analysis of Predictive Scheduling Algorithms for Minimizing Total Completion Time Problem;
最小化总完工时间预测调度算法的设计与分析
16.
Decrease duration, so the additional work is done over a shorter period of time
缩短工期,使附加的工作在更短时间内完成
17.
Increase task duration, so the additional work is done over a longer period of time
延长任务工期,使附加的工作在更长时间内完成
18.
Minimizing makespan on a batching machine with batch arrivals
极小化最大完工时间的批到达同时加工排序问题