说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 加权完工时间和
1.
Minimizing total weighted completion time in semiresumable case of single-machine scheduling with an availability constraint
带不可用时间段的部分可续型单机加权完工时间和调度
2.
The Parallel Batch Scheduling Problem with Family Jobs and Equal Processing Time to Minimize the Weighted Total Completion Time
加工时间相同的分族分批排序加权总完工时间问题
3.
Single Machine Scheduling Problem with Minimizing Weighted Completion Times with Resource Constrained;
资源有限的加权总完工时间单机排序问题
4.
A Semi-Online Algorithm for Solving the Single Machine Scheduling Problem to Minimize Total Weighted Completion Time with Discounted Factor
折扣加权总完工时间问题的半在线排序算法
5.
A Batching Scheduling Algorithm for Maximizing Total Weigted Number of Jobs Completed in Due Date Window;
交货时间区间内加权完工工件个数最大的分批排序算法
6.
An Unbounded Batch Scheduling Problem with Incompatbile Job Families to Minimize the Weighted Total Completion Time
一类无界的不相容工件族分批排序加权总完工时间问题
7.
The problem of minimizing the total weighted completed time on single batch processing machine is studied.
讨论了单机分批排序问题中目标是极小化加权总完工时间的问题。
8.
Dynamic Programming Algorithm on Two Machines Cross Docking Scheduling with Total Weighted Completion Time;
以总加权完工时间为目标的两台机越库排序的动态规划算法
9.
Analysis of Heuristic Algorithm for the Flexible Flow Shop Weighted Completion Time Scheduling Problem;
柔性Flow shop加权完成时间调度问题的启发式算法
10.
Decrease duration, so the additional work is done over a shorter period of time
缩短工期,使附加的工作在更短时间内完成
11.
Increase task duration, so the additional work is done over a longer period of time
延长任务工期,使附加的工作在更长时间内完成
12.
Drag to add a text box containing task name, scheduled start, scheduled finish, actual start and actual finish.
拖动以添加包含任务名称、预定开始时间、预定完成时间、实际开始时间和实际完成时间的文本框。
13.
Minimizing makespan on a batching machine with batch arrivals
极小化最大完工时间的批到达同时加工排序问题
14.
α-Bloch Spaces and Weighted Lipschitz Spaces;
α-Bloch空间和加权Lipschitz空间
15.
A RESEARCH ON THE CORRELATION OF TEMPORAL LOCUS, TEMPORAL DURATION ANDTEMPORAL SUCCESSION INFORMATION PROCESSING;
时点、时距和时序信息加工之间相关性研究
16.
The Optimum with the Shortest total Processing Time of on-Time Jobs
不误工工件加工时间之和最小的最优解
17.
Resources will work more hours per day, so the task will take less time to complete
资源每天工作小时数增加,任务将花费较少时间完成
18.
Estimation of TWA of Vinyl Chloride Exposed Workers from the Results by Area Sampling
定点采样法估算氯乙烯作业工人8小时时间加权平均浓度