1)  freezing shaft sinking method
冻结法凿井
2)  frozen
冻结
1.
Pattern formation and frozen in chaotic laser arrays;
混沌激光器阵列中斑图的形成与冻结
2.
This article summarizes the effect of the choice of frozen dough process flow,preprocessing method,freezing condition,frozen storage and thawing method on the frozen dough.
主要探讨了冷冻面团加工过程中工艺流程的选择、冻结前的处理、冻结条件,冻藏条件和解冻方法对冷冻面团质量的影响以及冷冻面团加工中基本原料的选择和添加剂的种类对面团质量的影响。
3.
In this paper,two kinds of processing techniques of the fast frozen pods were introduced.
采用单体快速冻结能有效避免慢冻时产生大量冰晶,以防豆荚爆裂,冻结温度为-20~-25℃,时间为8~10min,温度过低会引起豆荚断条。
3)  freezing
冻结
1.
Construction technology of freezing method for mine auxiliary shaft in Zhangshuanglou Mine passing through swelling thick clay layer;
张双楼副井冻结法穿过膨胀性厚黏土层施工技术
2.
Effect of Freezing on PPO and POD Activity in Boletus aereus;
冻结条件对黑牛肝菌PPO和POD活性的影响
4)  Freeze
冻结
1.
A simulation studies on“freeze" and order of microstructure in the forming processes of amorphous metals;
非晶态形成过程中微观结构“冻结”和有序化的模拟研究
2.
The Establish of Mathematics Model for The Freeze of Freeze Board in Cold Board Vehicle;
冷板冷藏车内冷冻板冻结过程数学模型的建立
5)  freezing pressure
冻结压力
1.
Analysis on measurements of freezing pressure in deep thick clay strata;
深厚黏土地层冻结压力的实测分析
2.
Actual test and research of deep and thick calcium sticky layer freezing pressure;
深厚钙质粘土地层冻结压力的实测与研究
3.
Research on freezing pressure in deep thick alluvium is in great need with the increase in depth of frozen shaft.
冻结法凿井深度的增加,我国对深厚冲积层冻结井冻结压力分布的研究需求已经十分迫切。
6)  freezing method
冻结法
1.
The construction technology of freezing method and its development in our country;
我国冻结法施工技术及其发展
2.
The affection caused by variance of temperature to the strength of shaftwall in shafts constructed by freezing method;
冻结法施工中温度变化对井壁强度的影响
3.
Discussion on the attentive problems of sinking using freezing method;
冻结法凿井需注意问题的探讨
参考词条
补充资料:冻结凿井法
      在开凿井筒前,将井筒周围含水层用人工制冷方法,冻结成封闭的圆筒形冻结壁,以抵抗地压并隔绝地下水与井筒的联系,在冻结壁的保护下进行掘砌作业的施工方法。1862年英国首先将人工制冷方法用于基础工程。1883年德国最早用人工冻结法开凿立井。目前,英国冻结深度已达930m。1955年,中国首次在开滦林西煤矿开凿风井中应用,至1982年已开凿190多个井筒,累计冻结深度超过30000m,最大冻结深度415m。
  
  本法施工顺序是在井筒周围钻若干冻结孔,孔内安装由供液管、回液管和底端封闭的冻结管组成的冻结器;地面冷冻站将制出的低温媒剂(一般为-20~-30℃的盐水-氯化钙溶液)循环输送到冻结器内,吸收地层的热量,使含水层形成以冻结管为中心的冻结圆柱,逐渐扩大与相邻的冻结圆柱连成封闭的冻结壁(见图)。冻结壁达设计厚度后,即可进行井筒掘砌作业,直到顺利穿过不稳定地层为止。从冻结开始到冻结壁达到设计厚度的时间,称积极冻结期。掘砌时期须部分供冷,维护冻结壁,称维护冻结期或消极冻结期。掘砌工作完成后,拆除冷冻站,拔出冻结管,充填冻结孔,冻结壁自然解冻,恢复地层初始状态。
  
  冻结法是特殊凿井的主要方法之一,虽然需用设备较多,工期长,工作条件较差,成本较高,但安全可靠,施工技术较成熟。也可用于其他地下工程。
  
  

参考书目
   中国矿业学院主编:《特殊凿井》,第一版,煤炭工业出版社,北京,1981。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。