1) choosing project assessment
立项评估
1.
The technology monitoring and technology opportunities analysis facing choosing project assessment;
面向科研立项评估的技术监测和技术机会分析研究
2.
Scientific choosing project assessment is always one of the most important problems in the management science.
科研立项评估一直是管理科学研究关注的重点问题之一,客观公正的科研立项评估能够保证科研工作的顺利进展,切实可行的科研立项评估能够保证科研资金得到有效利用。
2) project evaluation
立项评估
1.
Research and application of project evaluation based on the BP neural network model;
基于BP网络模型的立项评估研究与应用
4) project appraisal
项目评估
1.
Existing problems and suggestions for venture investment project appraisal in China;
中国风险投资项目评估中存在问题及建议
2.
Based on the analysis of the characteristics of disaster resistant engine ering project, the principles of project appraisal of disaster resistant engineering are given The affirmation and measuring of costs and benefits of disaster resistant engineering project are discussed It offers bases for study of theory and methods of disaster resistant engineering project appraisa
在分析防灾工程项目特点的基础上 ,提出了防灾工程项目评估的基本原则 ,并对防灾工程项目效益和费用的确认与计量问题进行了讨论 ,为进一步研究防灾工程项目评估理论和方法奠定了基础。
3.
The paper tried to combine technological economics, environmental and resource economics, welfare economics and sociology analysis with the new research on sustainable development science, to analysis the function of technology introduction project appraisal in realizing sustainable development.
本文从项目评估的角度出发,试图用可持续发展目前的研究成果,将技术经济学、环境与资源经济学、福利经济学和社会学等多学科进行综合,分析技术引进项目评估在实现可持续发展中的作用,探讨技术引进项目评估指标与可持续性目标之间的关系并对评价指标的测度进行研究,同时,探讨了在可持续发展目标下对技术引进项目投资决策进行优选的模糊方法。
5) project evaluation
项目评估
1.
Discussing the project evaluation of water carriage construction in China;
浅谈对我国水运建设项目评估的一点看法
2.
Application of economic value added in project evaluation;
在项目评估中应用经济增加值指标
3.
Study on the Project Evaluation of Narcotics Control Youth Volunteers Works;
禁毒青年志愿工作项目评估研究
6) Project assessment
项目评估
1.
There are numerous approaches in project assessment, including three main types: qualitative analysis, quantitative analytic approaches and qualitative-quantitative combined analysis.
项目评估的方法众多,主要包括三类:定性分析法、定量分析法以及定性-定量综合分析法。
2.
In this paper, based on the characteristics of required information, a PAIS model is proposed according to the intersecting and relative dependence of the component part of the project assessment.
在分析项目评估中信息需求特点的基础上,依据项目评估各组成部分的交叉性和相对独立性,设计项目评估信息系统(PAIS)模式以“工具箱”式为主、“流水线”式相结合的功能结构。
3.
Feasibility study and project assessment hold the balance in project development cycle.
介绍了可行性研究和项目评估的定义、基本内容、工作程序以及目的、作用等,对加强中国石化建设项目前期管理、规范相应管理程序、确保项目科学决策具有一定的参考作用。
补充资料:地价评估趋势评估法
地价评估趋势评估法
【地价评估趋势评估法】土地价格在一定的时间内由于受诸多因素影响,呈周期性的波动,但总趋势是上升的,因此,利用一定的数学模型,就可以求算出地价,一般要通过回归分析,找出土地价格与时间变量之间的函数关系,画出地价发展变化趋势图形,然后建立数学模型,进而推算出地价。若以Y代表历年地价,X代表时间,丫代表地价,其关系式为:y‘=a+bx(a、b为常数)。采用这一方法,需以长年积累起来的地价变动资料作为分析依据。地价的时间序列最好在ro年以上。因为时间序列愈长,愈能排除偶然因素和短期因素对趋势值的异常干扰。另外,用地价长期趋势图可比较两个地段地价_L涨的强弱程度,如果长期趋线越陡,则表明该地段地价升值性越强;反之,则表明该地价的升值性越弱。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条