说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 定额计价弊端
1)  norms bargain disadvantage
定额计价弊端
2)  fixed quota pricing
定额计价
1.
Discussion the fixed quota pricing and detailed list pricing;
浅谈定额计价和清单计价的区别与联系
2.
Similarities and differences between engineering bill pricing and fixed quota pricing;
谈清单计价与定额计价的异同
3.
Measures to prompt the transformation from fixed quota pricing to engineering bill pricing mode;
谈定额计价如何向工程量清单计价转变
3)  Quota Valuation
定额计价
1.
This paper defined the concepts of quota valuation and a valuation inventory with amount of works and explained the difference between them through extensive practice.
定额计价与工程量清单计价模式的概念,在应用时经常发生混淆,文章通过实例和实践总结,从多方面阐述了这两种计价模式的不同之处。
2.
For valuation with bill quantities is at the preliminary stage which the fundamental research and the practice unify,quota valuation and valuation with bill quantities coexist.
在工程量清单计价处于理论研究与实践相结合的初步阶段,定额计价和工程量清单计价并存,两种计价模式下工程造价的编制依据容易混淆,本文在总结实践经验的基础上,运用实例,分析了二者的区别和联系,为合理确定工程造价提供了正确的途径。
3.
Expounds the basic concepts and characteristics of quota valuation mode and list valuation mode for the engineering amount of the construction project.
阐述了建设工程工程量定额计价模式与清单计价模式的基本概念与特点,提出了提供正确的工程量清单、严格审查施工单位索赔要求、注意综合单价调整范围等建设单位适应定额计价模式向清单计价模式转变应做好的几项工作。
4)  the stint cost
定额计价
1.
Compared the stint cost with the bill of quantity cost,this article formulizes the thought of raddling the budget and budget estimation.
针对建设部最新制定的《建设工程量清单计价规范》 ,本文提出了必须改革现有的土木工程概预算教材的紧迫性 ,在比较定额计价法和清单工程量计价法的基础上 ,提出了编制新的土木工程概预算教材的思路。
5)  quotation valuation
定额计价
1.
It illustrates the influence of quotation valuation on the early implementing stage of the valuation of bills of quantity,discusses the problems existing in the valuation of bills of quantity from integrity and efficiency,and summarizes the method and ways to solve problems,so as to realize better control to project cost.
阐述了定额计价在工程量清单计价实施初步阶段的影响,从完整性与时效性方面探讨了工程量清单计价应用中主要存在的问题,归纳了解决问题的方法和途径,从而更好地实现对工程造价的有效控制。
2.
It makes a survey of bills of quantity valuation,introduces the basic constitution of project cost using bills of quantity valuation, analyses the main differences between bills of quantity and quotation valuation,illustrates the meaning of using bills of quantity valuation,and concludes the work all parties should do when implementing the specifications.
对工程量清单计价方法作了概述,介绍了实行清单报价计价模式的工程造价基本构成,从几个方面分析了清单计价与定额计价的主要区别,并阐述了实行工程量清单计价的意义,最后总结出各方参与者在执行规范时应做好的工作。
6)  norm valuation
定额计价
1.
Then the author comparatively analyzed advantage and disadvantage of BOQ valuation model, also pointed out difference between norm valuation model and BOQ valuation model.
对比分析了工程量清单计价的特点和优点以及定额计价和工程量清单计价的区别。
补充资料:弊端
弊病:消除社会上流行的种种弊端。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条