说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 定额计价模式
1)  evaluating pattern of quota
定额计价模式
1.
This paper analyses the conflict between traditional evaluating pattern of quota and market-oriented economy,which expresses itself in inability to reflect such overall capacities as the proficiency of technology and management.
分析了传统定额计价模式与市场经济不相适应之处,其主要表现为它不能反映企业的技术、管理水平等企业整体实力。
2.
This paper analyzes the conflicts between traditional evaluating pattern of quota and market economy.
分析了传统定额计价模式与市场经济不相适应之处,讨论了我国实行工程量清单计价模式的优点,这种模式要求企业自主报价、由市场交易形成建筑产品的价格,是一种新的市场定价计价模式,能适应市场经济发展的要求。
2)  traditional quota pricing method
传统定额计价模式
3)  fixed quota pricing
定额计价
1.
Discussion the fixed quota pricing and detailed list pricing;
浅谈定额计价和清单计价的区别与联系
2.
Similarities and differences between engineering bill pricing and fixed quota pricing;
谈清单计价与定额计价的异同
3.
Measures to prompt the transformation from fixed quota pricing to engineering bill pricing mode;
谈定额计价如何向工程量清单计价转变
4)  Quota Valuation
定额计价
1.
This paper defined the concepts of quota valuation and a valuation inventory with amount of works and explained the difference between them through extensive practice.
定额计价与工程量清单计价模式的概念,在应用时经常发生混淆,文章通过实例和实践总结,从多方面阐述了这两种计价模式的不同之处。
2.
For valuation with bill quantities is at the preliminary stage which the fundamental research and the practice unify,quota valuation and valuation with bill quantities coexist.
在工程量清单计价处于理论研究与实践相结合的初步阶段,定额计价和工程量清单计价并存,两种计价模式下工程造价的编制依据容易混淆,本文在总结实践经验的基础上,运用实例,分析了二者的区别和联系,为合理确定工程造价提供了正确的途径。
3.
Expounds the basic concepts and characteristics of quota valuation mode and list valuation mode for the engineering amount of the construction project.
阐述了建设工程工程量定额计价模式与清单计价模式的基本概念与特点,提出了提供正确的工程量清单、严格审查施工单位索赔要求、注意综合单价调整范围等建设单位适应定额计价模式向清单计价模式转变应做好的几项工作。
5)  the stint cost
定额计价
1.
Compared the stint cost with the bill of quantity cost,this article formulizes the thought of raddling the budget and budget estimation.
针对建设部最新制定的《建设工程量清单计价规范》 ,本文提出了必须改革现有的土木工程概预算教材的紧迫性 ,在比较定额计价法和清单工程量计价法的基础上 ,提出了编制新的土木工程概预算教材的思路。
6)  quotation valuation
定额计价
1.
It illustrates the influence of quotation valuation on the early implementing stage of the valuation of bills of quantity,discusses the problems existing in the valuation of bills of quantity from integrity and efficiency,and summarizes the method and ways to solve problems,so as to realize better control to project cost.
阐述了定额计价在工程量清单计价实施初步阶段的影响,从完整性与时效性方面探讨了工程量清单计价应用中主要存在的问题,归纳了解决问题的方法和途径,从而更好地实现对工程造价的有效控制。
2.
It makes a survey of bills of quantity valuation,introduces the basic constitution of project cost using bills of quantity valuation, analyses the main differences between bills of quantity and quotation valuation,illustrates the meaning of using bills of quantity valuation,and concludes the work all parties should do when implementing the specifications.
对工程量清单计价方法作了概述,介绍了实行清单报价计价模式的工程造价基本构成,从几个方面分析了清单计价与定额计价的主要区别,并阐述了实行工程量清单计价的意义,最后总结出各方参与者在执行规范时应做好的工作。
补充资料:植物命名的模式和模式标本
    科或科级以下的分类群的名称,都是由命名模式来决定的。但更高等级(科级以上)分类群的名称,只有当其名称是基于属名的也是 由命名模式来决定的。种或种级以下的分类群的命名必须有模式标本根据。模式标本必须要永久保存,不能是活植物。模式标本有下列几种:
    (1)主模式标本(全模式标本、正模式标本)(holotype)是由命名人指定的模式标本,即著者发表新分类群时据以命名、描述和绘图的那一份标本。
    (2)等模式标本(同号模式标本、复模式标本)(isotype)系与主模式标本同为一采集者在同一地点与时间所采集的同号复份标本。
    (3)合模式标本(等值模式标本)(syntype)著者在发表一分类群时未曾指定主模式而引证了2个以上的标本或被著者指定为模式的标本,其数目在2个以上时,此等标本中的任何1份,均可称为合模式标本。
    (4)后选模式标本(选定模式标本)(lectotype)当发表新分类群时,著作未曾指定主模式标本或主模式已遗失或损坏时,是后来的作者根据原始资料,在等模式或依次从合模式、副模式、新模式和原产地模式标本中,选定1份作为命名模式的标本,即为后选模式标本。
    (5)副模式标本(同举模式标本)(paratype)对于某一分类群,著者在原描述中除主模式、等模式或合模式标本以外同时引证的标本,称为副模式标本。
    (6)新模式标本(neotype)当主模式、等模式、合模式、副模式标本均有错误、损坏或遗失时,根据原始资料从其他标本中重新选定出来充当命名模式的标本。
    (7)原产地模式标本(topotype)当不能获得某种植物的模式标本时,便从该植物的模式标本产地采到同种植物的标本,与原始资料核对,完全符合者以代替模式标本,称为原产地模式标本。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条