说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 定额计价方法
1)  way of pricing through quota
定额计价方法
2)  list valuation method
定额计价法
1.
Comparing analgses list valuation method and ration valuation method;
工程量清单计价法与定额计价法的对比分析
3)  fixed quota pricing
定额计价
1.
Discussion the fixed quota pricing and detailed list pricing;
浅谈定额计价和清单计价的区别与联系
2.
Similarities and differences between engineering bill pricing and fixed quota pricing;
谈清单计价与定额计价的异同
3.
Measures to prompt the transformation from fixed quota pricing to engineering bill pricing mode;
谈定额计价如何向工程量清单计价转变
4)  Quota Valuation
定额计价
1.
This paper defined the concepts of quota valuation and a valuation inventory with amount of works and explained the difference between them through extensive practice.
定额计价与工程量清单计价模式的概念,在应用时经常发生混淆,文章通过实例和实践总结,从多方面阐述了这两种计价模式的不同之处。
2.
For valuation with bill quantities is at the preliminary stage which the fundamental research and the practice unify,quota valuation and valuation with bill quantities coexist.
在工程量清单计价处于理论研究与实践相结合的初步阶段,定额计价和工程量清单计价并存,两种计价模式下工程造价的编制依据容易混淆,本文在总结实践经验的基础上,运用实例,分析了二者的区别和联系,为合理确定工程造价提供了正确的途径。
3.
Expounds the basic concepts and characteristics of quota valuation mode and list valuation mode for the engineering amount of the construction project.
阐述了建设工程工程量定额计价模式与清单计价模式的基本概念与特点,提出了提供正确的工程量清单、严格审查施工单位索赔要求、注意综合单价调整范围等建设单位适应定额计价模式向清单计价模式转变应做好的几项工作。
5)  the stint cost
定额计价
1.
Compared the stint cost with the bill of quantity cost,this article formulizes the thought of raddling the budget and budget estimation.
针对建设部最新制定的《建设工程量清单计价规范》 ,本文提出了必须改革现有的土木工程概预算教材的紧迫性 ,在比较定额计价法和清单工程量计价法的基础上 ,提出了编制新的土木工程概预算教材的思路。
6)  quotation valuation
定额计价
1.
It illustrates the influence of quotation valuation on the early implementing stage of the valuation of bills of quantity,discusses the problems existing in the valuation of bills of quantity from integrity and efficiency,and summarizes the method and ways to solve problems,so as to realize better control to project cost.
阐述了定额计价在工程量清单计价实施初步阶段的影响,从完整性与时效性方面探讨了工程量清单计价应用中主要存在的问题,归纳了解决问题的方法和途径,从而更好地实现对工程造价的有效控制。
2.
It makes a survey of bills of quantity valuation,introduces the basic constitution of project cost using bills of quantity valuation, analyses the main differences between bills of quantity and quotation valuation,illustrates the meaning of using bills of quantity valuation,and concludes the work all parties should do when implementing the specifications.
对工程量清单计价方法作了概述,介绍了实行清单报价计价模式的工程造价基本构成,从几个方面分析了清单计价与定额计价的主要区别,并阐述了实行工程量清单计价的意义,最后总结出各方参与者在执行规范时应做好的工作。
补充资料:地下采矿方法设计的计算机方法


地下采矿方法设计的计算机方法
computerized design of under-ground mining method

  d一x!0 eo一kuong fongfo shejl deJ一suanjl fongfa地下采矿方法设计的计算机方法(c omPuter-ized design of underground mining method)用计算机和优化技术完成地下采矿方法设计的一种手段。由于地下采矿方法设计时,要考虑的因素很多,判断决策时又十分灵活,没有固定的程式和准则,计算机处理时难度较大,因此,世界各国在20世纪80年代才开始将计算机和现代数学方法应用于地下采矿方法的设计。地下采矿法设计的计算机方法包含采矿方法优选和采场结构参数的优化两方面的内容。其目的是达到安全、经济、有效地采出矿石。 采矿方法的优选主要方法有模糊数学法、专家系统法、多目标决策法和价值工程法等。 (l)模糊数学法选择采矿方法的主要依据是众多的地质技术条件。但是,并没有定义明确的选择准则可以遵循,所以,采用模糊数学法处理。首先,初选一些采矿方法作为候选者,已知这些采矿方法所要求的地质技术条件。然后列出拟选择采矿方法的矿山的地质技术条件,计算并确定它们与候选采矿方法所要求的地质技术条件之间的模糊相似程度,选择条件最相近的那个采矿方法。 模糊数学还可用来预测采矿方法将取得的技术经济指标。首先,列出本矿山的地质技术条件,再收集一些采用同样采矿方法的其他矿山的地质技术条件,对它们进行模糊聚类。聚类时,与本矿山近似程度最高的矿山取得高权值,其余矿山按聚类近似程度排序依次取较低的权值;然后将各矿山用这种采矿方法取得的技术经济指标加权平均,得到本矿山采用这种采矿方法可能取得的技术经济指标。 (2)专家系统法采矿专家选择采矿方法时,通常先根据矿岩稳固性选择空场法、崩落法或充填法等采矿方法的大类别;然后根据矿体倾角及其他条件选择运输方式和长壁法、分段崩落法等采矿方法小类别;再根据矿体厚度或分段高度选择浅孔、中深孔或深孔等不同的落矿方式。这个过程是一个明显的逻辑推理过程。把这种逻辑因果关系总结成规则,存放在计算机系统中,就建立了采矿方法选择的专家系统(见采矿专家系统)。使用时,输人所设计的矿山的地质技术条件.系统就会自动推理,选择出适用的采矿方法。 (3)多目标决策法选择采矿方法时,考虑采矿成本、采准切割量、矿石贫化率、矿石损失率、采场生产能力等多个因素。这些因素从不同侧面反映采矿方法的优劣,具有各自的计量单位。采用多目标决策法,将这些因素综合起来,从整体上评价几种采矿方法的可行方案,从中择优。 (4)价值工程法价值工程中,事物的价值用其功能与成本的比值来衡量。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条