2) anchorage
[英]['æŋkərɪdʒ] [美]['æŋkərɪdʒ]
锚碇
1.
Test study on mechanism of shear-slip of anchorage in suspension bridge;
悬索桥锚碇剪切滑移的机理及试验初探
2.
Design and construction of anchorage system for steel cofferdam;
泸州长江大桥主墩钢围堰锚碇系统的设计与施工
3.
Finite Element Analysis on the Temperature Field of the Massive Concrete Anchorage of Haicang Bridge
海沧大桥大体积混凝土锚碇温度场有限元分析
3) anchor
[英]['æŋkə(r)] [美]['æŋkɚ]
锚碇
1.
As an important part of supporting structure,anchoring controls the project progress of suspension bridge.
锚碇作为承力结构的重要部分,是悬索桥的重点控制性工程。
2.
The paper introduces the experience of applying D-B model to the construction of the south anchor of Wuhan Yangluo Changjiang Highway Bridge.
介绍武汉阳逻长江公路大桥南锚碇工程采用设计-施工总承包模式的经验,对相关的招标和项目管理工作进行总结。
3.
Engineers made 2 plans for position of prestressed steel pipes of the north anchoring system of Wuhan Yangluo Changjiang River Road Bridge.
武汉阳逻长江公路大桥北锚碇锚固系统预应力钢管定位,采用了门式桁架初步固定预应力钢管、安装过程中用全站仪测量,并通过微调装置控制的方法。
4) anchor mound
锚碇
1.
The main steps to prevent temperature crack in anchor mound mass concrete of Changjiang River Bridge in Yichang are described, and all kinds of temperature control methods and effect was present.
介绍了宜昌长江大桥锚碇大体积混凝土施工防止温度裂缝的主要过程 ,并对各种温控措施及其效果进行了评述 ,证明所采取的措施是行之有效和切合实际的。
2.
In this paper,the result of mass concrete temperature monitoring Haicang Bridge east anchor mound is introduced.
介绍了海沧大桥东锚碇大体积混凝土的温度监测结果,结合温控标准研究温控措施的效果。
3.
It is described that the main regulative steps of temperature to prevent slits in the enormous concrete anchor mound construction that is in rock of deep base pit in the south bank of Changjiang River Bridge in Jiangying.
介绍了江阴长江大桥南锚碇深基坑嵌岩锚大体积混凝土施工防止裂缝的主要温控措施。
5) anchoring
[英]['æŋkə] [美]['æŋkɚ]
锚碇
1.
Stability Analysis of the Rockmass in the East Anchoring Area of Guang Dong Humen Bridge;
广东虎门大桥东锚碇岩体稳定性分析
2.
Southern anchoring foundation of RunYang suspension bridge across Yangtse River is a tremendous gravity structure of con-crete.
润扬长江公路大桥南锚碇基础为混凝土重力式结构,体积巨大,基坑采用冻结法止水。
6) post-pouring
后浇段
1.
The anti-cracking techniques are presented in this paper,including the double mixture technique,the post-pouring and cool water pipes set technique and the favorable casting time chosen to control the maximum temperature and the temperature difference between the outside and the inside.
野三河大桥主墩底座为高强大体积混凝土结构,为防止出现裂缝,施工中采取了双掺技术优化混凝土配合比、合理设置后浇段以及采用冷却水管内散外蓄和选择有利浇筑时间降低混凝土最高温度等裂缝控制措施,以有效地控制混凝土的最高温度和内表温差。
补充资料:十报恩 赠段先生 折段字起
【诗文】:
公物外好生涯。火相逢结大砂。女盘桓看大药。牛哮吼戏灵葩。云铺地丹炉赫,子观天碧眼华。有三生君省悟,中无事步烟霞。
【注释】:
【出处】:
公物外好生涯。火相逢结大砂。女盘桓看大药。牛哮吼戏灵葩。云铺地丹炉赫,子观天碧眼华。有三生君省悟,中无事步烟霞。
【注释】:
【出处】:
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条