1.
Mixing Proportion Selection and Temperature Control of the Concrete of the Later?pouring Blocks of Anchorage in Haicang Bridge
海沧大桥锚碇后浇段混凝土配合比选定与温度控制
2.
The concrete pump is only relocated after a number of sections have been completed.
浇注完数段路面板后,才移动混凝土泵。
3.
Analyse and Control of Cracks of Prestressed Concrete Box Girder Web
悬浇箱梁节段张拉后腹板裂纹成因分析与防治
4.
The successful alternative was the cast-in-place segmental prestressed concrete box girder.
最后采用的方案是分段现浇的预应力混凝土箱形梁。
5.
Application of After-irrigation-strip Design and Construction in Super-long Cast-in-place Concrete Structure
后浇带在现浇混凝土超长结构中的应用
6.
Study on Dismantling Mold Base of Post-Pouring Band in Cast-in-place Reinforced Concrete Structure
浅探现浇钢筋混凝土结构后浇带模架的拆除
7.
Study on Cable Tension Optimization of Cable-stayed Bridge in Segmental Scaffold Construction Method;
支架节段现浇法斜拉桥索力优化研究
8.
The concrete pouring and temperature control technology in plugging segment of diversion tunnel
导流洞封堵段混凝土浇筑及温控技术
9.
In-situ Monitoring Technology on Continuous Rigid Frame Cantilever Casting Beam
连续刚构悬臂浇筑段的现场测控技术
10.
The construction technology of Pengxi river cable stayed bridge side span cast-in-place section and closure section
彭溪河斜拉桥边跨现浇段及合龙段施工工艺
11.
Cable Force Optimization of Cable-stayed Bridge Casting in Place on All Supported Framework and Definition of Construction Stage Cable Force
支架现浇斜拉桥索力优化及施工阶段索力确定
12.
On errors investigation in concrete grouting at connecting box girder construction
连续箱梁施工阶段混凝土浇筑误差调查分析
13.
Simulating Analysis of Concrete Steep Slope Dam Thermal Stresses during Hyperthermia Seasons
高温季节浇筑陡坡坝段温度应力仿真研究
14.
Design and Construction of Cast-in-place Support in Large Length and Altitude and in Large Tonnage
大长度大高度大吨位现浇段支架设计与施工
15.
Finite Element Stress Analysis of Cast-in-Situ Slabs During Construction
施工阶段现浇楼板应力状态的有限元分析
16.
Design and Construction Technology of the Cast-in-place Support at the Side-spans of a Continuous Rigid Framde Bridge
连续刚构桥边跨现浇段支架法设计及施工技术
17.
Constructional scheme and technical features of Xintan Bridge beam cast-in-place rigid frame paragraph
新滩大桥刚构梁现浇段施工方案及技术特点
18.
The man who waters his grass after a good rain is carrying coals to New-castle.
雨后浇草的人真是画蛇添足。