说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 锚碇门桥
1)  mooring portal bridge
锚碇门桥
1.
On the basis of analysis of the requirements for working time schedule and regulations of lifting and erection of steel box girders of Xihoumen Bridge,this paper proposes a construction scheme for positioning delivery barges of the steel box girders in the channel by using a mooring portal bridge to be built with large ton.
分析西堠门大桥钢箱梁的吊装工期要求和吊装规程要求,提出利用大吨位混凝土蛙锚和浮动平台构筑锚碇门桥、实施钢箱梁运输船定位的方案,并对箱梁运输船的水阻力、锚链力进行了初步计算,对工程实施具有指导意义。
2)  bridge anchor
大桥锚碇
3)  Bridge anchorage
桥梁锚碇
4)  anchorage [英]['æŋkərɪdʒ]  [美]['æŋkərɪdʒ]
锚碇
1.
Test study on mechanism of shear-slip of anchorage in suspension bridge;
悬索桥锚碇剪切滑移的机理及试验初探
2.
Design and construction of anchorage system for steel cofferdam;
泸州长江大桥主墩钢围堰锚碇系统的设计与施工
3.
Finite Element Analysis on the Temperature Field of the Massive Concrete Anchorage of Haicang Bridge
海沧大桥大体积混凝土锚碇温度场有限元分析
5)  anchor [英]['æŋkə(r)]  [美]['æŋkɚ]
锚碇
1.
As an important part of supporting structure,anchoring controls the project progress of suspension bridge.
锚碇作为承力结构的重要部分,是悬索桥的重点控制性工程。
2.
The paper introduces the experience of applying D-B model to the construction of the south anchor of Wuhan Yangluo Changjiang Highway Bridge.
介绍武汉阳逻长江公路大桥南锚碇工程采用设计-施工总承包模式的经验,对相关的招标和项目管理工作进行总结。
3.
Engineers made 2 plans for position of prestressed steel pipes of the north anchoring system of Wuhan Yangluo Changjiang River Road Bridge.
武汉阳逻长江公路大桥北锚碇锚固系统预应力钢管定位,采用了门式桁架初步固定预应力钢管、安装过程中用全站仪测量,并通过微调装置控制的方法。
6)  anchor mound
锚碇
1.
The main steps to prevent temperature crack in anchor mound mass concrete of Changjiang River Bridge in Yichang are described, and all kinds of temperature control methods and effect was present.
介绍了宜昌长江大桥锚碇大体积混凝土施工防止温度裂缝的主要过程 ,并对各种温控措施及其效果进行了评述 ,证明所采取的措施是行之有效和切合实际的。
2.
In this paper,the result of mass concrete temperature monitoring Haicang Bridge east anchor mound is introduced.
介绍了海沧大桥东锚碇大体积混凝土的温度监测结果,结合温控标准研究温控措施的效果。
3.
It is described that the main regulative steps of temperature to prevent slits in the enormous concrete anchor mound construction that is in rock of deep base pit in the south bank of Changjiang River Bridge in Jiangying.
介绍了江阴长江大桥南锚碇深基坑嵌岩锚大体积混凝土施工防止裂缝的主要温控措施。
补充资料:门桥
      用两个以上的桥脚舟(或其他浮体)和上部结构,或用两个以上的桥脚舟与上部结构合一的舟结合而成的浮游结构物。按用途分为漕渡门桥 (见彩图)、桥节门桥、打桩门桥和锚定门桥。漕渡门桥主要用于渡送技术兵器和车辆过河,门桥上有供技术兵器和车辆上、下门桥用的跳板等设备。桥节门桥是浮桥的一段,其两端有供架桥时相互连接的结构;当用门桥架设法架设浮桥时,将预先结合好的桥节门桥逐个引入桥轴线,连接成浮桥。打桩门桥上配有打桩和起吊设备,用于构筑列柱桥脚时在水上打桩和运送桥梁构件,桥梁撤收时可用于拔桩。锚定门桥配有锚和固定浮桥用的设备,用于大的江河或直接锚定有困难的江河上固定浮桥。门桥可用专用的门桥器材和舟桥器材结合,也可用民舟和木、竹、金属材料等就便器材结合。专用的门桥器材有自行的和非自行的两类。自行门桥水陆均能自行,非自行门桥水上航行靠舟桥汽艇或操舟机驱动,陆上用车辆运输。
  
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条