说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 锚碇设备
1)  anchoring and mooring equipment
锚碇设备
1.
The anchoring and mooring equipments are briefly introduced in the paper,with the resistance of floating structures in water analyzed.
简要介绍了锚碇设备,分析了浮体所受阻力,在保证锚链强度的基础上,给出了锚力、锚数和锚链长度的计算方法,对实践操作有一定的指导意义。
2)  design of anchorage
锚碇设计
3)  anchorage [英]['æŋkərɪdʒ]  [美]['æŋkərɪdʒ]
锚碇
1.
Test study on mechanism of shear-slip of anchorage in suspension bridge;
悬索桥锚碇剪切滑移的机理及试验初探
2.
Design and construction of anchorage system for steel cofferdam;
泸州长江大桥主墩钢围堰锚碇系统的设计与施工
3.
Finite Element Analysis on the Temperature Field of the Massive Concrete Anchorage of Haicang Bridge
海沧大桥大体积混凝土锚碇温度场有限元分析
4)  anchor [英]['æŋkə(r)]  [美]['æŋkɚ]
锚碇
1.
As an important part of supporting structure,anchoring controls the project progress of suspension bridge.
锚碇作为承力结构的重要部分,是悬索桥的重点控制性工程。
2.
The paper introduces the experience of applying D-B model to the construction of the south anchor of Wuhan Yangluo Changjiang Highway Bridge.
介绍武汉阳逻长江公路大桥南锚碇工程采用设计-施工总承包模式的经验,对相关的招标和项目管理工作进行总结。
3.
Engineers made 2 plans for position of prestressed steel pipes of the north anchoring system of Wuhan Yangluo Changjiang River Road Bridge.
武汉阳逻长江公路大桥北锚碇锚固系统预应力钢管定位,采用了门式桁架初步固定预应力钢管、安装过程中用全站仪测量,并通过微调装置控制的方法。
5)  anchor mound
锚碇
1.
The main steps to prevent temperature crack in anchor mound mass concrete of Changjiang River Bridge in Yichang are described, and all kinds of temperature control methods and effect was present.
介绍了宜昌长江大桥锚碇大体积混凝土施工防止温度裂缝的主要过程 ,并对各种温控措施及其效果进行了评述 ,证明所采取的措施是行之有效和切合实际的。
2.
In this paper,the result of mass concrete temperature monitoring Haicang Bridge east anchor mound is introduced.
介绍了海沧大桥东锚碇大体积混凝土的温度监测结果,结合温控标准研究温控措施的效果。
3.
It is described that the main regulative steps of temperature to prevent slits in the enormous concrete anchor mound construction that is in rock of deep base pit in the south bank of Changjiang River Bridge in Jiangying.
介绍了江阴长江大桥南锚碇深基坑嵌岩锚大体积混凝土施工防止裂缝的主要温控措施。
6)  anchoring [英]['æŋkə]  [美]['æŋkɚ]
锚碇
1.
Stability Analysis of the Rockmass in the East Anchoring Area of Guang Dong Humen Bridge;
广东虎门大桥东锚碇岩体稳定性分析
2.
Southern anchoring foundation of RunYang suspension bridge across Yangtse River is a tremendous gravity structure of con-crete.
润扬长江公路大桥南锚碇基础为混凝土重力式结构,体积巨大,基坑采用冻结法止水。
补充资料:净化设备——混凝设备
净化设备——混凝设备
 

 

 

 
文章编辑:moji
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条