说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 二级水电站
1)  second cascade hydropower station
二级水电站
2)  Jinping Second Class Waterpower Station
锦屏二级水电站
1.
Main geological problems in diversion tunnel construction at Jinping Second Class Waterpower Station;
锦屏二级水电站引水隧洞主要工程地质问题分析
2.
Taking the surrounding rock of deep-buried caverns at the Jinping Second Class Waterpower Station as an example,uniaxial compression tests are performed to study the influence of temperature on the Poisson ratio and elastic modulus under different temperatures.
选取锦屏二级水电站引水隧洞围岩大理岩作为试样,进行不同温度条件下的单轴压缩试验,分析温度作用对大理岩弹性模量、泊松比等力学参数的影响。
3)  Hongye Hydropower Station II
红叶二级水电站
1.
Application of vibroflotation to foundation consolidation for power house of Hongye Hydropower Station II;
振冲法在红叶二级水电站厂房地基加固中的应用
4)  Longshou II Hydropower Station
龙首二级水电站
1.
Longshou II Hydropower Station is an Grade three Project with middle scale.
龙首二级水电站为中型三等工程。
2.
Longshou II hydropower station is the seventh cascade hydropower station of the hydropower cascade planning for Heihe.
龙首二级水电站是黑河水能梯级规划的第七座梯级电站。
5)  selection of parameter
白水河二级电站
6)  Jinping II Hydropower Station
锦屏二级水电站
1.
Nonlinear inversion of 3D initial geostress field in Jinping II Hydropower Station region;
锦屏二级水电站厂址区域三维地应力场非线性反演
2.
Jinping II Hydropower Station,located in Sichuan Province,is the biggest station at the Yalong River.
以具有代表性的锦屏二级水电站地下厂房第二层开挖过程中厂右0+263安装间部位上游边墙围岩单层变形增量达20 mm、变形速率达3。
3.
Jinping II Hydropower Station is characterisized by the four diversion tunnels which are very long and deep-buried.
锦屏二级水电站引水隧洞属于深埋特长隧洞,其中2条引水隧洞施工采用敞开式硬岩掘进机(TBM)进行施工。
补充资料:拉格朗德二级水电站
拉格朗德二级水电站
La Grande-2 Hydroelectric Power Station

   加拿大魁北克省境内拉格朗德河梯级开发中(自下而上)的第二级水电站。距河口117千米。是加拿大最大的水电站。控制流域面积(包括跨流域引水控制面积)3875平方千米。通过跨流域引水后,平均年径流量为927亿立方米。基岩为花岗岩,覆盖层厚20米。斜心墙堆石坝最大坝高168米,坝顶长2835米。另有副坝29座。总库容617亿立方米。主厂房长483.4米、宽26.5米、高47.3米,是世界上最大的地下厂房。总装机容量532.8万千瓦。多年平均年发电量358亿千瓦·时。泄洪设施为岸边溢洪道,泄量达15300立方米/秒。工程于1973年开工,1982年竣工。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条