说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 锦屏二级水电站
1.
Study on the Hydraulic Characteristics of Jinping Cascade-II Hydropower Station with Long Diversion Tunnel
锦屏二级水电站长引水隧洞水力特性研究
2.
Rock Classification of Diversion Tunnel Study of Jinping Ⅱ Hydropower Station in Yalong River
雅砻江锦屏二级水电站引水隧洞围岩分类研究
3.
Seepage Simulation on Water Seal Failure behind Cut-off Wall in Jinping 2nd Stage Hydropower Station
锦屏二级水电站防渗墙后止水缝失效渗流计算
4.
Three Dimensional Seepage Analysis on Diversion Tunnel of Jinping No.2 Hydropower Station
锦屏二级水电站引水隧洞三维渗流分析
5.
Numerical simulation of rockburst on the drain tunnel in the Jinping Second Level Hydropower Station
锦屏二级水电站施工排水洞岩爆数值模拟
6.
Research on Geological Advance Prediction for the Traffic Tunnel of JinPing Ⅱ Hydropower Station;
锦屏二级水电站辅助洞超前地质预报技术研究
7.
A Study on the Prediction and Prevention of Rockburst in the Traffic Tunnel of Jinping Ⅱ Hydropower Station;
锦屏二级水电站交通隧道岩爆预测及防治研究
8.
Optimization of Construction Schemes of Diversion Tunnel in Jinping Second Cascade Hydropower Station
锦屏二级水电站导流隧洞施工方案优化
9.
Study on Eco-Environmental Water Demand about the Segment of Water Reduced for the Jinping Second Class Hydropower Station of Yalong River;
雅砻江锦屏二级水电站减水河段生态环境需水研究
10.
Stability Study and Strengthen about High Slope of Enter Water Mouth of Diversion Tunnel of Secondly Hydroelectric Power Station of Jinping;
锦屏二级水电站引水隧洞进水口高边坡稳定性研究及加固处理
11.
Study on Transport of Groundwater of Jinping Cascade Ⅱ Hydropower Station with Long Diversion Tunnel
锦屏二级水电站引水隧洞施工期涌突水数值模拟
12.
Study on Surrounding Rock Stability of Deep-lying Diversion Tunnel in Jingping Cascade 2 Hydropower Station.;
锦屏二级水电站深埋长引水隧洞围岩稳定性分析与研究
13.
Unloading Mechanical Character of the Surrounding Rock of the Jinping Hydraulic Power Plant and Its Application;
锦屏二级水电站引水隧洞围岩卸荷力学特性试验研究与应用
14.
Study on the Pridiction and Prevention of Rockburst in the Diversion Tunnel of Jinping Ⅱ Hydropower;
锦屏二级水电站引水隧洞岩爆预测及防治对策研究
15.
The Smooth Blasting Technology of High Geostresses Section of the Diversion Tunnel on the Eastern End of Jinping II Hydropower Station
锦屏二级水电站东端引水隧洞高地应力洞段光面爆破技术
16.
Nano-concrete construction technology for support lining of diversion tunnel for Jinping Hydropower Station Ⅱ
锦屏二级水电站引水隧洞支护喷纳米混凝土施工工艺
17.
RESEARCH ON GROUNDWATER TRANSPORT,INFLUENCE AND CONTROL IN TUNNELGROUP OF JINPING II HYDROPOWER STATION DURING CONSTRUCTION
锦屏二级水电站隧洞群施工期地下水运移、影响及控制研究
18.
Ventilation Solution for west-end diversion tunnel construction in Jingping Ⅱ hydropower station
锦屏二级水电站西端引水隧洞施工通风解决方案