1) Xi er River Second-cascade Hydropower Station
西洱河二级水电站
2) Xierhe RiverⅠHydropower Station
西洱河一级电站
1.
While renewing wicket gates for a turbine Type HLA41-LJ-190 at Xierhe RiverⅠHydropower Station,it was successfully to complete the aperture processing of connecting pins between wicket gates and crutches.
西洱河一级电站更换一台型号为HLA41—LJ—190水轮导叶时,利用现有设备,成功地完成导叶与拐臂连接销孔的加工。
3) selection of parameter
白水河二级电站
4) Xihe Hydropower Station
西河水电站
1.
Sand-proof and Water Diversion in the Diversion Keys at Xihe Hydropower Station;
西河水电站取水枢纽引水防沙问题
5) Xi erhe Ⅳ dam
西洱河四级大坝
6) Bajiao River-Ⅱ Hydropower Station
芭蕉河二级水电站
1.
Supervision on Contract Payment & Investment Control of Bajiao River-Ⅱ Hydropower Station;
芭蕉河二级水电站工程的合同支付和投资控制监理
2.
Design for Masonry Arch Dam of Bajiao River-Ⅱ Hydropower Station;
芭蕉河二级水电站浆砌石拱坝设计
补充资料:莱特西水电站
莱特西水电站 |
Letsi Hydropower Station |
概 述 |
莱特西水电站建于瑞典吕勒(Lule alv)河利拉(Lilla)狭谷。大坝为堆石坝,坝高85m,调节库容0.67亿m3。装机容量45万kW,年发电量17.1亿kW·h。工程于1967年竣工。 |