1) two level station of Zhenziling
榛子岭二级水电站
2) Doulingzi Hydropower Station
陡岭子水电站
1.
Preliminary Summary on Construction Management of Doulingzi Hydropower Station(Ⅰ);
夯实建设管理基础 追求电站最大效益(Ⅰ)——陡岭子水电站建设管理工作初步总结
2.
Treatment to vibration and shaft oscillation of hydro-generator set of Doulingzi Hydropower Station
陡岭子水电站机组振动与大轴摆度的处理
4) Shuangling Hydropower Station
双岭水电站
1.
Improvement of Working Seal of the Turbine for the Shuangling Hydropower Station;
双岭水电站水轮机工作密封改造
5) Jinping Second Class Waterpower Station
锦屏二级水电站
1.
Main geological problems in diversion tunnel construction at Jinping Second Class Waterpower Station;
锦屏二级水电站引水隧洞主要工程地质问题分析
2.
Taking the surrounding rock of deep-buried caverns at the Jinping Second Class Waterpower Station as an example,uniaxial compression tests are performed to study the influence of temperature on the Poisson ratio and elastic modulus under different temperatures.
选取锦屏二级水电站引水隧洞围岩大理岩作为试样,进行不同温度条件下的单轴压缩试验,分析温度作用对大理岩弹性模量、泊松比等力学参数的影响。
6) Hongye Hydropower Station II
红叶二级水电站
1.
Application of vibroflotation to foundation consolidation for power house of Hongye Hydropower Station II;
振冲法在红叶二级水电站厂房地基加固中的应用
补充资料:拉格朗德二级水电站
拉格朗德二级水电站 La Grande-2 Hydroelectric Power Station 加拿大魁北克省境内拉格朗德河梯级开发中(自下而上)的第二级水电站。距河口117千米。是加拿大最大的水电站。控制流域面积(包括跨流域引水控制面积)3875平方千米。通过跨流域引水后,平均年径流量为927亿立方米。基岩为花岗岩,覆盖层厚20米。斜心墙堆石坝最大坝高168米,坝顶长2835米。另有副坝29座。总库容617亿立方米。主厂房长483.4米、宽26.5米、高47.3米,是世界上最大的地下厂房。总装机容量532.8万千瓦。多年平均年发电量358亿千瓦·时。泄洪设施为岸边溢洪道,泄量达15300立方米/秒。工程于1973年开工,1982年竣工。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条