1)  Jinping II Hydropower Station
锦屏二级水电站
1.
Nonlinear inversion of 3D initial geostress field in Jinping II Hydropower Station region;
锦屏二级水电站厂址区域三维地应力场非线性反演
2.
Jinping II Hydropower Station,located in Sichuan Province,is the biggest station at the Yalong River.
以具有代表性的锦屏二级水电站地下厂房第二层开挖过程中厂右0+263安装间部位上游边墙围岩单层变形增量达20 mm、变形速率达3。
3.
Jinping II Hydropower Station is characterisized by the four diversion tunnels which are very long and deep-buried.
锦屏二级水电站引水隧洞属于深埋特长隧洞,其中2条引水隧洞施工采用敞开式硬岩掘进机(TBM)进行施工。
2)  Jinping Second Class Waterpower Station
锦屏二级水电站
1.
Main geological problems in diversion tunnel construction at Jinping Second Class Waterpower Station;
锦屏二级水电站引水隧洞主要工程地质问题分析
2.
Taking the surrounding rock of deep-buried caverns at the Jinping Second Class Waterpower Station as an example,uniaxial compression tests are performed to study the influence of temperature on the Poisson ratio and elastic modulus under different temperatures.
选取锦屏二级水电站引水隧洞围岩大理岩作为试样,进行不同温度条件下的单轴压缩试验,分析温度作用对大理岩弹性模量、泊松比等力学参数的影响。
3)  Jinping-II Hydropower Station
锦屏二级水电站
1.
Excavation of rock-wall crane beam for emergency gate chamber of intake for Jinping-II Hydropower Station;
锦屏二级水电站进水口事故闸门闸室岩壁梁开挖施工
2.
Construction of rock anchored beam of underground powerhouse for Jinping-II Hydropower Station;
锦屏二级水电站地下厂房岩锚梁施工
4)  The Second Hydro-electrical Power Station of Jin Ping
锦屏二级水电站
1.
The Second Hydro-electrical Power Station of Jin Ping, which is 4800MW-installed capacity, is planned to adopt the form of the underground factory building, which is formed by two large cavities.
锦屏二级水电站拟装机容量4800MW,采用地下厂房的布置形式,是以主厂房(344。
2.
The Second Hydro-electrical Power Station of Jin Ping, which is 4400MW-installed capacity, is planned to adopt the form of the underground factory building, which is formed by three large cavities.
锦屏二级水电站拟装机容量4400MW,采用地下厂房的布置形式,是以主厂房(335。
5)  Jinping power station II
锦屏二级电站
1.
According to the demand of Jinping power station II for hydraulic parameters,by means of CFD,all parts of model turbine including spiral case,stay vane,guide vane,runner and draft tube were optimized.
本文根据锦屏二级电站水轮机水力性能参数要求,采用CFD优化分析手段,对模型水轮机的蜗壳、固定导叶、活动导叶、转轮、尾水管进行了全面的水力性能优化。
6)  Jinping Ⅰ Hydropower Station
锦屏一级水电站
1.
Jinping Ⅰ Hydropower Station Dam Site Left Abutment High Slope Complicated Rock Mechanics Problems and Engineering Treatment Measures;
锦屏一级水电站坝区左岸高边坡复杂岩石力学问题及工程治理措施研究
2.
Jinping Ⅰ Hydropower Station Silicarenite Alkaline Activity Tests;
锦屏一级水电站石英砂岩碱活性试验研究
3.
Quarry Planning and Aggregate Processing System Design of Jinping Ⅰ Hydropower Station;
锦屏一级水电站料场规划及砂石加工系统方案设计