说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 爬模
1)  climbing formwork
爬模
1.
Construction Technology of climbing formwork on kengkou thermo power plant high reinforced concrete chimney;
坑口火电厂高耸钢筋砼烟囱爬模施工技术
2.
The integral soft climbing formwork used in high chimney construction does not need external scaffold; and the erection, dismantle and transport of formwork are completed in the process of self-climbing.
在高烟囱施工中,采用整体软爬模板,无须外脚手架,可在自爬过程中完成支、拆、倒运模板等工序,成品质量好,安全可靠,经济效益明显。
3.
This article summarizes the details at Domestic and foreign scholars\' research on tall formwork support system and construction technology of climbing formwork and construction process simulation and so on.
本文在详细归纳了国内外学者对高大模板支撑体系、爬模施工技术、施工过程模拟分析等方面研究进展,系统介绍了法门寺合十舍利塔建筑、结构设计的新颖之处,并列出了施工过程中的难点与特点,对以下几个方面进行了研究:(1)针对穹顶结构的支撑体系,设计分别采用扣件式、碗扣式、安德固支架的支撑体系三套方案,通过比较研究发现:采用扣件式、碗扣式、安德固支架都可以满足架体安全的要求;扣件式模板支架的应用较广泛,租用价格较低,但其搭设速度较慢,不能满足本工程工期的要求;碗扣式模板支架和安德固模板支架都能满足工期的要求,但安德固支架搭设速度更快,受力更合理,本项目最终确定安德固支架作为穹顶结构的模板支撑体系。
2)  climbing form
爬模
1.
The common problems of the middle tower construction is how to locate the active cross brace,the methods of ensuring the concrete against crack,the technologic and operation skills of the climbing form.
介绍在中塔柱施工中容易出现的问题,如何确定主动横撑的位置、确保根部混凝土不开裂的方法,爬模工艺流程和操作要点。
2.
This paper expounds the main construction method of west cable tower of Chongqing Egongyan Yangtze River Suspension Bridge, and gives a detailed description of construction technology of climbing form system with an inner climbing scaffold.
介绍重庆长江鹅公岩大桥悬索桥西塔主要施工方法 ,对西塔塔柱内爬架爬模系统施工工艺作了详细阐述。
3.
The construction of the Zhong-tain Square Project s standard storey s exterior beams,and exterior columns and core walls have been done by climbing form work.
中天广场标准层外梁、外柱和核心筒墙体采用爬模 ,标准层楼面采用飞模。
3)  climbing formwork and climbing frame method
爬模爬架法
4)  hydraulic climbing formwork
液压爬模
1.
At the same time,based on the construction characteristics of core-tube structure,many technologies are introduced including hydraulic climbing formwork technology,grade-separation climbing formwork construction technology and .
结合北京市中海广场中楼工程,介绍在超高层钢结构-钢筋混凝土大型复杂核心筒工程施工中,核心筒内外墙体液压自爬模技术与立体交叉式施工工艺相结合的施工方法;同时针对该工程核心筒筒体内结构施工的特点,介绍了大型复杂核心筒内外墙体液压爬模技术、立体交叉爬模施工工艺、组合式物料平台技术、现场总线多点同步控制技术。
2.
1 for the Suzhou-Nantong Bridge,the system of hydraulic climbing formwork and the technological construction process are expounded in the paper and some methods are proposed for handling any problems cropped up during the use of the climbing formwork system.
结合苏通大桥主1号墩的施工,介绍了液压爬模体系及施工工艺流程,并对使用中出现的一些问题,提出了改进的办法。
3.
Taking the Guangdong Provincial Public Security Bureau s central control project construction as an example, there are the comprehensive descriptions about hydraulic climbing formwork s features, structures.
以广东省公安厅指挥中心为例,介绍液压爬模的特点、构造、安装顺序及施工方法,液压爬模操作安全方便,适合内筒剪力墙及全剪结构工程的施工。
5)  creeping formwork device
爬模装置
6)  climbing formwork system
爬模系统
1.
The DOKA climbing formwork system presented in this paper,including its large-scale self-climbing system and formwork supporting structures,was imported abroad for North Pylon Construction Project,Wuhan Yangluo Changjiang River Highway Bridge.
DOKA爬模系统是武汉阳逻长江公路大桥北塔工程从国外引进的大型自升式模板、支架结构,从设计、组拼、工程实践等方面,介绍了DOKA爬模系统的设计特点和施工优势。
补充资料:爬升模板施工


爬升模板施工
climbing form

Pasheng muban shigong爬升模板施工(elimling form)用附设在模板结构上的提升装置把脱模后的一段模板提升一个灌筑高度继续灌筑竖向混凝土的施工方法。提升的着力点设置在模板下口已达到规定强度的硬化混凝土上。 发展过程欧洲在20世纪70年代开始发展爬升模板。中国在推广使用液压滑动模板过程中,鉴于模板贴着混凝土面滑升摩阻力很大,会拉裂或带起模内已灌筑的混凝土,因此,在倾度大的筒壁施工中,出现了先使模板脱离混凝土面再行提升,或采取滑框倒模的做法。又因滑动模板提升的着力点在支承杆上端,需要采取多种措施维持稳定,不如把支承点设在模板下口已硬化的混凝土上更为简便稳固。如此,中国在80年代末期,逐渐发展了爬升模板施工工艺。 墓本构造爬升模板的构造,按不同的使用对象有不同的形式,主要分为支承架和提升架两部分。提升架带着模板和作业台,支吊在支承架上;支承架为简单的框架,擂置在提升架中,下端有紧固装置固定在模板下口已硬化的混凝土壁面上。支承架上端伸出提升架的顶部,可以安装提升装置,以承吊提升架的全部荷载。其布置如图。 组装方法在墙基上面先用常规支模方法灌筑一段高约1.sm的墙体,并按一定间距预埋穿墙螺栓,其组装程序如下:(1)每个支承架通过穿墙螺栓固定在墙体上;(2)提起提升架与支承架套插配对,并在支模高度处与支承架临时固定;(3)在支承架与提升架之间安装提升装里,使提升架吊挂在支承架上;(4)在提升架上安装作业支架,使相邻提升架之间用跳板和围圈相连,(5)每个提升架位置找正后,在其上安装内外模板,模板上有丝杠可以调整模板的倾度和脱模,模板下口与已灌筑的混凝土面相贴接。几个相邻提升架之间的模板可连成一片,以便分区提升。提升架的间距一般为1.sm,每个提升架的施工荷载不超过10kN,一般小型提升机具都可使用。界舟 爬升模板构造示意 1混凝土墙壁:2一支承架;3一提升架;4模板;5一穿墙 螺栓.6一固定装里;7一提升装置 灌筑和提升整个模板结构组装完毕并试提升合格后,即可灌筑第一段混凝土(左图)。混凝土到达脱模强度后,转动丝杠把模板拉离混凝土面,启动提升装置使提升架带着模板和作业架上升一个灌筑高程,重新调整和固定模板位置,然后灌筑第二段混凝土(右图)。此时,提升架、模板和新灌筑的混凝土结合成一体,能承受一定的施工荷载,可以拆除支承架与墙面的连接,使重量着落在提升架上。开动提升装置,使支承架以提升架为着力点提升一个灌筑高程,再通过穿墙螺栓与墙面固定,又可灌筑下一段混凝土。如此重复作业直到墙顶。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条