1)  hydraulic climbing formwork method
液压爬模法
2)  hydraulic climbing formwork
液压爬模
1.
At the same time,based on the construction characteristics of core-tube structure,many technologies are introduced including hydraulic climbing formwork technology,grade-separation climbing formwork construction technology and .
结合北京市中海广场中楼工程,介绍在超高层钢结构-钢筋混凝土大型复杂核心筒工程施工中,核心筒内外墙体液压自爬模技术与立体交叉式施工工艺相结合的施工方法;同时针对该工程核心筒筒体内结构施工的特点,介绍了大型复杂核心筒内外墙体液压爬模技术、立体交叉爬模施工工艺、组合式物料平台技术、现场总线多点同步控制技术。
2.
1 for the Suzhou-Nantong Bridge,the system of hydraulic climbing formwork and the technological construction process are expounded in the paper and some methods are proposed for handling any problems cropped up during the use of the climbing formwork system.
结合苏通大桥主1号墩的施工,介绍了液压爬模体系及施工工艺流程,并对使用中出现的一些问题,提出了改进的办法。
3.
Taking the Guangdong Provincial Public Security Bureau s central control project construction as an example, there are the comprehensive descriptions about hydraulic climbing formwork s features, structures.
以广东省公安厅指挥中心为例,介绍液压爬模的特点、构造、安装顺序及施工方法,液压爬模操作安全方便,适合内筒剪力墙及全剪结构工程的施工。
3)  hydraulic self-climbing form
液压自爬模
1.
11 of Zhongxian Changjiang River Bridge as an example,this paper mainly presents the key points and assurance measures of the climbing construction techniques for hydraulic self-climbing form system and the varied design made for the form system in the design process in order to accommodate pylon structure.
以忠县长江大桥11号墩主塔施工为例,重点介绍液压自爬模系统爬升施工技术要点、保证措施,以及液压自爬模系统设计中对于适应主塔结构所做的变更设计。
4)  hydraulic up-climbing shuttering
液压爬升模板
1.
The construction technology of hydraulic up-climbing shuttering is developed by our country,and the construction technique of it is after up-climbing one floor walls and columns,pouring one floor slab.
我国自行研发的可升降液压爬升模板施工技术,采取爬升1层墙柱,浇筑1层楼板的施工工艺,已成功地在欧洲最高建筑、世界最高全现浇钢筋混凝土结构工程中应用。
5)  hydraulic crawl
液压爬行
1.
It proposes six impulse components which can develop hydraulic crawl and analyses them qualitatively.
分析中提出了产生液压爬行的6个脉冲分量,并针对这6个脉冲分量进行定性分析,且在分析中有针对性的提出了一些消除或减小液压爬行的对策及措施。
6)  climbing formwork and climbing frame method
爬模爬架法
补充资料:凹模、凸凹模工作型面加工工艺过程
1)备料。 n
    2)锻造。锻成长方形的坯料(每件留长工艺夹头)。 n
    3)热处理。退火。   n
    4)铣(刨)削。铣(刨)削六面成长方形模块。 n
    5)磨削。磨削上、下两端面及相邻两侧面,用90。角尺测量相邻两面的垂直度。 n
    6)钳工加工。用平板和划线盘按图划线,并打样冲眼;用钻头钻螺纹底孔;用圆柱销孔的预孔;用钻头钻挡料销让位孔;用钻头在中心处钻穿丝孔等;正、反面孔口倒角;凸凹模用钻头孔扩,保证刃口高度;攻螺纹;铰孔。n
  7)铣削。平口钳装夹工件;用的立铣刀铣削型孔至尺寸,保证深度。 n
   8)热处理。凹模工件淬硬至HRC60~64,凸凹模工件淬硬至HRC58~62。 n
   9)平磨。磨上、下两端面及相邻两侧面,用90。角尺测量相邻两面的垂直度至图要求;退磁。 n
   10)线切割。按图编制线切割程序,切割模型孔成形,留单面研磨余量0.005 mm。 n
   11)钳工加工。研光线切割面: n
   12)检验。 n复合冲裁模的装配应选择凸凹模作为装配基准件,先装下模部分,后装上模部分