1) integral climbing form
整体爬模
1.
Hydraulic integral climbing form system was applied to the construction of the project phase II of China International Trade Center,Beijing.
北京中国国际贸易中心二期工程办公楼 ,采用全液压整体爬模系统 ,施工中注重整个系统的平稳顶升。
2) climbing form system
爬模体系
1.
The con-struction of the JFYM50hydraulic climbing form system with integral lift-up is adopted.
国家大剧院歌剧院舞台通道为超高大筒体结构,采用JFYM50整体提升液压爬模体系施工。
4) Climbing formwork 150F
150F爬升模板体系
1.
This paper introduces the composition, construction and quality control techniques of DOKA Large-area formwork Top 50 and Climbing formwork 150F applied in the construction of tanks of Guangdong LNG Receiving Station.
介绍广东天然液化气接收站罐体筒身施工时采用了德国Doka Top50大墙模板体系和150F爬升模板体系,以及模板的组成、模板的施工和模板的质量控制。
5) An integral electric lifting scaffold
整体电动升降外爬架
6) climbing formwork
爬模
1.
Construction Technology of climbing formwork on kengkou thermo power plant high reinforced concrete chimney;
坑口火电厂高耸钢筋砼烟囱爬模施工技术
2.
The integral soft climbing formwork used in high chimney construction does not need external scaffold; and the erection, dismantle and transport of formwork are completed in the process of self-climbing.
在高烟囱施工中,采用整体软爬模板,无须外脚手架,可在自爬过程中完成支、拆、倒运模板等工序,成品质量好,安全可靠,经济效益明显。
3.
This article summarizes the details at Domestic and foreign scholars\' research on tall formwork support system and construction technology of climbing formwork and construction process simulation and so on.
本文在详细归纳了国内外学者对高大模板支撑体系、爬模施工技术、施工过程模拟分析等方面研究进展,系统介绍了法门寺合十舍利塔建筑、结构设计的新颖之处,并列出了施工过程中的难点与特点,对以下几个方面进行了研究:(1)针对穹顶结构的支撑体系,设计分别采用扣件式、碗扣式、安德固支架的支撑体系三套方案,通过比较研究发现:采用扣件式、碗扣式、安德固支架都可以满足架体安全的要求;扣件式模板支架的应用较广泛,租用价格较低,但其搭设速度较慢,不能满足本工程工期的要求;碗扣式模板支架和安德固模板支架都能满足工期的要求,但安德固支架搭设速度更快,受力更合理,本项目最终确定安德固支架作为穹顶结构的模板支撑体系。
补充资料:整体模塑料
分子式:
CAS号:
性质:以间苯二甲酸型不饱和聚酯树脂为基础的改进型团状模塑料,又称块状模塑料。整体模塑料与团状模塑料、块状模塑料近已倾向于统称团状模塑料。
CAS号:
性质:以间苯二甲酸型不饱和聚酯树脂为基础的改进型团状模塑料,又称块状模塑料。整体模塑料与团状模塑料、块状模塑料近已倾向于统称团状模塑料。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条