说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 穹顶施工
1)  construction of vault
穹顶施工
2)  dome [英][dəʊm]  [美][dom]
穹顶
1.
Construction techniques for containment dome shuttering work of nuclear island of fast reactor;
快堆核岛安全壳穹顶模板工程施工技术总结
2.
The blasting construction on silo dome of left bank mixing system of Xiaowan power station;
小湾电站左岸拌合系统料仓竖井穹顶爆破施工
3.
Experimental study on the ultimate load-bearing capacity of a new dome formed by means of post-tensioning;
后张拉整体成形穹顶的极限承载力试验研究
3)  ripping construction
挑顶施工
1.
Application of CD method in the inclined shaft ripping construction of Guanyintang tunnel;
CD法在观音堂隧道斜井挑顶施工中的应用
2.
This paper introduces the transitional measures for the transformation of the construction from the loess transverse 6~# tube into the main tunnel, and expounds the steel frame turning construction of transverse tube, the setting up of the gantry at the junction between the transverse tube and the main tunnel, and the ripping construction of the main tunnel.
介绍了黄土隧道横洞进入正洞施工的过渡措施,着重对横洞钢架转向施工、横洞与正洞交界处门架的设置、正洞挑顶施工进行了详细的阐述。
3.
3 auxiliary incline shaft of Nanliang Tuunel on Shijiazhuang-Taiyuan Special Passenger Railway Line as the example,this paper introduces the construction method adopted in the hard wall-rock for rapidly finishing the ripping construction,guaranteeing the effective control of the over-excavation and less-excavation,and rapidly forming the two-way work capacity in the main tunnel.
以石太客运专线南梁隧道3#斜井施工为例,介绍了在硬质围岩施工中快速完成挑顶施工,确保有效控制超欠挖,快速形成主洞双向作业能力的施工方法。
4)  jacking construction
顶进施工
1.
The application of jacking construction technique in existing railway construction;
顶进施工技术在既有铁路施工中的应用
2.
Generalization of the jacking construction line reinforcing of haven-built railways;
铁路既有线顶进施工线路加固总结
3.
Discussion of the jacking construction of oblique crossing frame bridge and suggestions;
斜交框构顶进施工的探讨与建议
5)  jacking construction
顶管施工
1.
The jacking construction steps of polluted water main tube net project of Sanxiang town Zhongshan city;
中山市三乡镇污水主干管网工程顶管施工措施
2.
In the combination with project example the paper states the destruction phenomenon of roads along lines due to the jacking construction of urban sewers.
结合工程实例,阐述由于城市污水管道的顶管施工导致沿线道路产生的破坏现象,分析了破坏的原因,提出了具体的处理方法并总结经验教训。
6)  pipe-jacking construction
顶管施工
1.
In the construction of inverted siphon project of Puxian Bridge,due to the complex geological conditions of the site and being affected by permeation of surface water and ground water,the sinking well and pipe-jacking construction has serious hidden dangers in the construction,which prevent the construction from going on.
普贤桥倒虹吸管工程施工中,由于场地地质条件复杂,受到地表水与地下水的渗透影响,沉井顶管施工存在严重施工隐患问题,无法继续施工,通过采用高压喷射注浆法技术措施处理后,沉井顶管施工安全顺利完成,取得成功经验。
2.
Slump failure happened in Luolong Rd-through pipe-jacking construction for sewersof Guanlin Avenue asthe soil isof sandy gravel.
关林大道污水管道顶管施工穿越洛龙路,土层为砂砾石,管顶及周围出现坍塌现象,为防止洛龙路路基下沉,沿污水管位置钻孔,采用回填注浆处理。
3.
According to site monitoring and test results, the mechanism and behaviour of soil deformation induced by large-scale pipe-jacking construction are analyzed and a significant mechanism theory is presented.
根据现场监测和试验结果,对大型顶管施工产生的周围土体扰动变形的机理和特性进行了分析研究,提出了对工程有指导意义的扰动机理理论;同时,考虑扰动区土体密实度变化的影响,对Peck的地表沉降理论计算公式进行了修正,修正的Peck理论公式的计算结果与实测结果更为一致。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条