1) Operation on pier top
墩顶施工
2) pier construction
墩身施工
1.
According to the characteristics of pier construction of Hangzhou Bay Cross - sea Bridge such as the permeation of chlorine ions and the precision requirement on the protection layer, this paper introduces a new efficient anti-erosion material, the epoxide-coated reinforcement bar, including its making, installation, storage, transport, hanging, processing and repairing, etc.
结合杭州湾跨海大桥墩身施工的实际特点(氯离子的渗透性,以及对保护层精度的要求),介绍了一种新型高效的建筑防腐材料——环氧涂层钢筋。
3) bridge pier construction
桥墩施工
1.
The paper mainly introduces the application quality and economical effect of wood-steel composite formwork in the bridge pier construction.
本文着重介绍了木钢组合模板在桥墩施工中的应用质量和经济效果。
2.
Cofferdam method is often applied for bridge pier construction in the formations with big sand-pebble particles,peripheral anti-seepage method and the construction technology are very important for anti-seepage effect.
对于在砂卵石含量高、粒径较大的地层进行桥墩施工,多利用围堰法,围堰能否正常施工,则其外围的截防渗措施及施工工艺对防渗效果至关重要。
5) high pier construction
高墩施工
1.
Brief talk on effect of the stiff skeleton in the high pier construction
浅谈劲性骨架在高墩施工中的作用
6) construction of the single-posted pier
独柱墩施工
补充资料:顶管施工
顶管施工
黝 顶管施工
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条