1) push bench construction process
顶管施工法
1.
Application of the push bench construction process in the culvert construction;
顶管施工法在涵洞施工中的应用
2) Tunnelling by pipe jaching
顶管法施工
3) pipe driving construction method
顶管施工方法
1.
The pipe driving construction method characteristics,pipe material choice,pipe driving force calculation and apex distance determination,working pit and receiving pit selection and size determination were analyzed.
对顶管施工方法工艺的特点、管材选择、顶力计算和顶距确定、工作坑和接收坑选用及尺寸确定等方面进行了分析,并提出了顶管法施工应注意的一些事项,以推广顶管技术的应用。
4) jacking construction
顶管施工
1.
The jacking construction steps of polluted water main tube net project of Sanxiang town Zhongshan city;
中山市三乡镇污水主干管网工程顶管施工措施
2.
In the combination with project example the paper states the destruction phenomenon of roads along lines due to the jacking construction of urban sewers.
结合工程实例,阐述由于城市污水管道的顶管施工导致沿线道路产生的破坏现象,分析了破坏的原因,提出了具体的处理方法并总结经验教训。
5) pipe-jacking construction
顶管施工
1.
In the construction of inverted siphon project of Puxian Bridge,due to the complex geological conditions of the site and being affected by permeation of surface water and ground water,the sinking well and pipe-jacking construction has serious hidden dangers in the construction,which prevent the construction from going on.
普贤桥倒虹吸管工程施工中,由于场地地质条件复杂,受到地表水与地下水的渗透影响,沉井顶管施工存在严重施工隐患问题,无法继续施工,通过采用高压喷射注浆法技术措施处理后,沉井顶管施工安全顺利完成,取得成功经验。
2.
Slump failure happened in Luolong Rd-through pipe-jacking construction for sewersof Guanlin Avenue asthe soil isof sandy gravel.
关林大道污水管道顶管施工穿越洛龙路,土层为砂砾石,管顶及周围出现坍塌现象,为防止洛龙路路基下沉,沿污水管位置钻孔,采用回填注浆处理。
3.
According to site monitoring and test results, the mechanism and behaviour of soil deformation induced by large-scale pipe-jacking construction are analyzed and a significant mechanism theory is presented.
根据现场监测和试验结果,对大型顶管施工产生的周围土体扰动变形的机理和特性进行了分析研究,提出了对工程有指导意义的扰动机理理论;同时,考虑扰动区土体密实度变化的影响,对Peck的地表沉降理论计算公式进行了修正,修正的Peck理论公式的计算结果与实测结果更为一致。
6) pipe jacking
顶管施工
1.
The application of bentonite in pipe jacking works;
膨润土在顶管施工中的应用
2.
The technique of pipe jacking has been widely applied to water supply and drainage projects on the lower reaches of the Yangtze River; however, the integrality, stability and safety of the Yangtze levee are threatened by the disturbance to the foundation soil.
长江下游岸边取排水工程大多采用顶管施工工艺穿越长江大堤,顶管施工对地基土的强烈扰动严重威胁大堤的完整性、稳定性和安全性。
3.
This paper analyzes the deviation in pipe jacking practice,with the D N1 500 mm concrete pipe jacking as an example,which lies to the east of the historic Yellow River channel in Xuzhou.
对排水混凝土管道顶管施工中出现的偏差进行了分析 ,阐述了不出现较大偏差时应采取的挖土、顶进和检测方法 ,并提出了一种挖土校正中线偏差的方
补充资料:顶管施工
顶管施工
黝 顶管施工
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条