1) water inlet station
进水站
1.
Design scheme of sunk-well of water inlet station works of Zhongjia water purification plant in Zhongshan;
中山市中嘉水质净化厂进水站沉井设计方案
2) pump sump
泵站进水池
1.
Applicability of turbulence models in numerical simulation of vortex flow in pump sump;
湍流模型在泵站进水池漩涡模拟中的适用性研究
3) Intake
[英]['ɪnteɪk] [美]['ɪn'tek]
电站进水口
1.
Intake Model Tests for Bakun Hydropower Project in Malaysia;
马来西亚巴贡水电站进水口模型试验
4) hydropower station intake tower
水电站进水塔
1.
Processing of the hydropower station intake tower s foundation of BMPDP;
百色水利枢纽水电站进水塔基础处理
6) hydropower station inlet configuration
电站进水口体形
1.
Summa on hydropower station inlet configuration optimizing test research for Three Gorges Project;
三峡电站进水口体形优化试验研究综述
补充资料:水电站进水口
水电站进水口
intake of hydropower station
shL一}d一on之hon JlnshL]IkotJ水电站进水口(intake of hydropower sta-tion)水轮发电机组从水库或河流中引水的水工建筑物,它由进水口通道和上部结构所组成。进水口通道包括进口喇叭段、闸门段和渐变段。为了防止污物进人水轮机在进口段的前缘设有拦污栅。在闸门段内设有检修闸门和事故闸门.当发生事故时,事故闸门能在动水中关闭,以保证引水管道和水电站的安全。能在动水中快速关闭的闸门称快速闸门。事故闸门的开启一般需要平压后在静水中开启。检修闸门的启闭均需在静水中进行。进水口上部结构设有工作平台、启闭机和清污设备。 进水口的布置应考虑防泥沙、防污物、防冰冻(简称“三防”),同时还要保证进水畅通和流态平稳,以上是进水口设计中要考虑的最基本的问题。 进水口按水流条件,可分为深孔式进水口、浅孔式进水口和开敞式进水口3种基本型式。深孔式进水口和浅孔式进水口完全淹没在水面以下,所以又称为有压进水口或压力进水口,进人孔口的水流无自由水面,后接压力引水道。开敞式进水口又称无压进水口,孔日上部开敞,进人孔口的水流有自由水面,后接明渠或无压引水道。 进水口按所在位置,可分为岸式进水口、塔式进水口和坝式进水口3种,位于库旁边的均称为岸式进水口,独立于坝体和岸边之外的称为塔式进水[1,位于河床坝上的称为坝式进水口。 进水口布!包括平面位置选择、高程确定和孔口尺寸确定等方面。进水口的平面位置应结合引水管道和发电厂房位置综合考虑。应尽可能将其置于河流凹岸或靠近主流部位、不宜将其置于多泥沙支流和沟谷出口的下游,进水口前方的流态应平稳顺畅,没有回流和漩涡发生,避免将漂浮物带向进水[1前,进水口的高程和孔口尺寸确定,应保证在最低运行水位时能引进发电所需的足够流量,而且不露顶、不进气.以保证压力管道和水轮机的稳定运行。进水口过流通道具有流线形的轮廓体型、顺水流方向的断面尺寸应呈连续曲线逐渐收缩,使沿程压力分布均匀,流速变化连续.无脱壁和涡流现象发生,使进人管道水流平稳,水头损失最小。 进水口的“三防” 防治泥沙根据水流中推移质和悬移质的含量、粒径、硬度、比重以及泥沙运动规律和淤积形态,可采取以下措施:①设置冲沙闸,将泥沙导离进水口;②设置拦沙坎,将推移质拦截在进水口前.排至下游河道;③设置排沙孔,将淤积到进水口前的泥沙排向下游;④设置沉沙池,将随着水流越过进水口的悬移质泥沙沉淀下来,再由排沙设施将其排人河道。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条