1.
Study on the Hydraulic Characteristics of Multi-Level Intake Structure of Hydropower Station;
水电站进水口分层取水水力特性研究
2.
Recheck stability of left bank slope at water intake of Baise HPP
百色水电站进水口左侧边坡稳定复核
3.
Under-Crossbeam Breaking Treatment of No.3 Trashrack on Water Inlet in Jiangk ou Hydropower Station
江口水电站进水口3号拦污栅下横梁断裂处理
4.
Study on stability of the tunnel-face slope at Houziyan Hydropower Station
猴子岩水电站进水口洞脸边坡稳定性分析
5.
RCC Engineering Technique Applied to Intake Section of Longtan Hydropower Station
龙滩水电站进水口坝段碾压混凝土施工技术
6.
Concrete Temperature Control for Intake Dam Section of Longtan Hydropower Station
龙滩水电站进水口坝段混凝土温度控制
7.
Numerical simulation on the side inlet/outlet of pumped storage power station
抽水蓄能电站侧式进/出水口数值模拟
8.
The Research on Outflow Characteristic of Flank Inlet-Outlet in Pumped Storage Station;
抽水蓄能电站侧式进出水口出流水流特性研究
9.
Study on the Hydraulic Characteristics at the Side Inlet/outlet of the Pumped Storage Plant;
抽水蓄能电站侧式进/出水口水力特性研究
10.
Study on Hydraulic Characteristics of the Vertical Pipe Intake of Pumped Storage Plants
抽水蓄能电站竖井式进水口水力特性研究
11.
The Stability Analysis of the In-Outflow Slope of Shuangjiangkou Hydroelectric Power Station;
双江口水电站进出水口边坡稳定性分析
12.
Water Guiding Tunnel Slope Stability Analysis in Right Bank in JinChuan Hydro-power Station;
金川水电站右岸导流洞进水口边坡稳定性评价
13.
Research on Slope Stability of Intake Slope on Right Bank of Jinping Ⅰ Hydropower Station;
锦屏一级水电站右岸进水口边坡稳定性研究
14.
Study on Hydraulic Design and CFD Numerical Simulation for Side Inlet-Outlet of Pumped Storage Power Stations;
抽水蓄能电站侧式进/出水口设计研究及CFD模拟
15.
Numerical Simulation of Trash Rack in a Pumped Storage Plant;
抽水蓄能电站进/出水口拦污栅数值模拟
16.
Numerical Simulation on the Vertical Pipe intake of Pumped Storage Plants;
抽水蓄能电站竖井式进/出水口数值模拟
17.
Design of upper water inlet/outlet penstock for Yixing Pumped-Storage Power Station
宜兴抽水蓄能电站上进/出水口压力钢管设计
18.
Contact grouting construction for intake steel linings on left bank of Longtan Hydropower Station
龙滩水电站左岸进水口钢衬接触灌浆施工