说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 进站天桥
1)  entrance bridge
进站天桥
1.
The overview of the entrance bridge of Nanjing Railway Station is given.
介绍了南京火车站旅客进站天桥的工程概况,较详细地介绍了钢结构天桥的结构设计过程,包括对整个天桥结构采用有限元软件进行计算分析,以及结构构件和节点设计等方面的内容。
2)  Tianqiao Hydropower Station
天桥水电站
1.
Schemes Analysis of Extending Flux for Wiping off Danger of Tianqiao Hydropower Station;
天桥水电站扩泄除险方案分析
2.
Analysis on prototype observation on lifting power of spillway tunnel working gate for Tianqiao Hydropower Station;
天桥水电站泄洪洞工作闸门启闭力原型观测成果分析
3.
Study on Composite Bottom-surface Flow Energy Dissipation and General Operation Alternatives of Tianqiao Hydropower Station;
天桥水电站底面流混合消能及枢纽运行方案研究
3)  Tianshengqiao hydropower station
天生桥水电站
1.
Design and Practice of Plastic Concrete Anti-Seepage Wall in the Auxiliary Dam Foundation of Tianshengqiao Hydropower Station
天生桥水电站副坝基础塑性混凝土防渗墙设计与实践
2.
Viewed from the relationship of the change of the switching on system design in the Tianshengqiao Hydropower Station with the power transmission from west to east, the planning of power system shall be made on the basis of the national macro control.
从天生桥水电站接入系统设计的变迁与西电东送的关系可以看出 ,电力系统的规划应该是在国家宏观调控的基础上进行的 ,只有站在西电东送的高层面上 ,才能看到云南、贵州两省丰富的能源资源开发与广东省国民经济发展的密切关系 ,实现东西部的共同发展、共同富裕。
4)  Tianshenqiao Hydropower Station
天生桥水电站
1.
Design of fire-fighting system of Tianshenqiao Hydropower Station in Ningqiang County;
宁强县天生桥水电站消防系统设计
5)  GIB earth-fault
天生桥二级电站
1.
The paper introduces distinguishing, seeking and treating of 220 kV GIB earth-fault inTianshengqiao Hydropower station Ⅱ.
介绍天生桥二级电站220kVGIB接地故障的判别查找及处理方法。
6)  periodic inspection of dam
天桥水力发电站
补充资料:进站
1.谓机动车辆进入车站。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条