您的位置:首页 -> 词典 -> 高水头水电站
1)  hydropower station with high head
高水头水电站
2)  high water-head power station
高水头电站
1.
The impulse turbine unit is normally used in high water-head power stations,whose diversion system is long and is likely to cause pressure fluctuation.
高水头电站一般采用冲击式水轮发电机组,引水系统长,容易产生水压波动。
3)  Tianhu hydropower station with high water head
天湖高水头水电站
4)  high-head hydro-power station
高水头[水力发]电站
5)  hydropower station under high head and lower flow rate
高水头小流量电站
1.
Experimental study on semi-pressure tank-type energy dissipator for hydropower station under high head and lower flow rate;
高水头小流量电站箱式半压力消能工的试验研究
6)  low water head power station
低水头电站
1.
Large amount of excavating quantity of a project can be decreased by optimizing the design of surge chamber of low water head power station.
低水头电站调压室优化设计可以节省较大工程量 ,采用特征线法对一实际工程引水发电系统进行了数学模拟和稳定性计算分析 ,指出水电站引水发电系统稳定性由调压室断面积和机组调速器共同决定 ,调速器参数整定合适时 ,低水头电站调压室断面积可以采用小于托马公式计算所得的面积。
补充资料:水电站水头
      水电站上游引水进口断面和下游尾水出口断面之间的单位重量水体所具有的能量差值,常以米(m)计量。一般以两处断面的水位差值表示,称为水电站毛水头。从毛水头中扣除引水系统各项水头损失后,即得水电站净水头。水电站水头和引用流量是构成水电站发电能力的两个主要动力因素,常用的特征水头如下。
  
  ①水电站最大水头:即水电站上下游水位中可能同期出现的最大差值。它是水电站建筑物设计和水轮机结构强度设计时的一项重要数据。
  
  ②水电站最小水头:即水电站上下游水位中可能同期出现的最小差值。它是水轮发电机在效率降低的情况下,保证水轮机安全稳定运行的最低水头。
  
  ③水电站平均水头:一般以算术平均水头表示,有时也用电能加权平均水头表示。前者是水库径流调节后各时段的水头累计值除以总时段数。后者是将径流调节后各时段的水头,乘以相应时段的出力,累计后再除以计算期的总出力。水电站平均水头和电能加权平均水头,用于确定水轮发电机或水泵水轮机的各项参数,如直径和转速等。
  
  ④水电站设计水头:中国现以水电站运行中能保证水轮发电机发足额定容量的最小水头为设计水头。欧美各国则称之为水电站额定水头,苏联称之为计算水头。当水电站运行水头小于设计水头时,机组出力达不到额定出力,因此它是选择水轮机尺寸的一个基本数据。设计水头应通过比较分析确定。欧美各国有时也把水轮机最高效率相应的水头称之为设计水头。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。