说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 坪头水电站
1)  Pingtou hydropower station
坪头水电站
1.
Based on Q-type cluster analysis of 18 water samples of karst-water system in Pingtou hydropower station,the paper draws hierarchical cluster graph.
该文以坪头水电站为例,对厂址区的18个水样进行Q型聚类分析,绘制出聚类分析谱系图。
2.
The ancient landslide of Ergu groove– Wanbo groove,which is located on the banks of site areaⅢdistrict at Meigu Pingtou hydropower station , is a deep oblique bedding rock slide.
尔古沟-万波沟古滑坡位于美姑河坪头水电站厂址区Ⅲ区岸坡上,为一斜向顺层深切岩质滑坡。
2)  Eping hydropower station
鄂坪水电站
1.
Research on long-term optimal dispatching of Eping hydropower station;
鄂坪水电站长期优化调度研究
3)  Dongping Hydropower Station
东坪水电站
1.
Impermeability Test of Concrete with Fly Ash & Its applicationin Dongping Hydropower Station;
东坪水电站粉煤灰混凝土的抗渗性试验与应用
4)  Sangping hydropower station
桑坪水电站
1.
For construction of surge tank of Sangping hydropower station, the stepping and self-drilling hollow grout injection anchor rods are used in fractured rock at high slope and shallow landslide, resulting in good consolidation and anchorage in the surrounding rock.
介绍了桑坪水电站调压井高边坡在破碎岩体中采用迈式自钻式中空注浆锚杆,对破碎岩体及浅层塌方体的围岩固结锚固技术起到了很好的效果,对加快施工进度、降低施工难度、提高经济效益等方面都起到了较好的作用,为相似地质条件下的水电工程施工提供了参考。
5)  Dongping hydropower station
洞坪水电站
1.
Production test of the foundation grout curtain for the double curvature dam of Dongping Hydropower Station;
洞坪水电站双曲拱坝基础帷幕灌浆生产性试验
2.
Automatic control of long-distance feeding for aggregate storage bin of batching plant on left-bank of Dongping Hydropower Station
洞坪水电站左岸搅拌楼骨料仓远距离进料自动控制
3.
The powerhouse system of Dongping Hydropower Station in Hubei Province is a structure of underground cavern,with the characteristics of complex structure,big construction disturbance,difficult construction field and traffic.
湖北洞坪水电站厂房系统为地下洞室结构,具有结构复杂、施工干扰大、施工场地及施工交通困难等特点。
6)  Siping hydropower station
寺坪水电站
1.
Grouting tests were carried out in accordance with the characteristics of the soft rock dam foundation at the Siping hydropower station to investigate effective methods and technologies for raising the grouting pressure in the treatment of soft rock da.
本次灌浆试验针对寺坪水电站大坝坝基软弱岩体的特殊性,研究及探索在中—弱透水性软弱岩层坝基处理中有效提高灌浆压力的方法和工艺。
2.
The height of face slab rock fill dam at Siping hydropower station is 90.
寺坪水电站面板堆石坝坝高90。
补充资料:陇头水送别
【诗文】:
相送陇山头,东西陇水流。从来心胆盛,今日为君愁。
暗雪迷征路,寒云隐戍楼。唯馀旌旆影,相逐去悠悠。



【注释】:



【出处】:
全唐诗:卷139_28全唐诗:卷139_28
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条