说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 低水头电站
1.
Francis turbine is applicable for the middle and low water level power station, Both have vertical and horizontal structure, and commonly designed in the scroll.
混流式水轮机用于中、低水头电站,有卧式、式两种,一般采用金属蜗壳。
2.
Francis turbine is applicable for the middle and low water level power station,Both have vertical and horizontal structure,and commonly designed in the scroll.
混流式水轮机用于中、低水头电站,有卧式、立式两种,一般采用金属蜗壳。
3.
Wu Lei Tau Lowland Raw Water Pumping Station
狐狸头低地原水抽水站
4.
Optimum Design of the Turbine Used in Low-Head Power Station without Storage;
低水头径流式电站水轮机优化选型设计
5.
Three Dimensional Simulation and Low-head Operation Stability of Longtan 700MW Turbine Runner
龙滩水电站700MW机组转轮水力计算及低水头运行稳定性优化分析
6.
Primary Frequency Regulation Test of 5~# Unit of Laxiwa Hydropower Station under Low Water Head
浅析拉西瓦水电站5号机组在低水头下的一次调频试验
7.
This is a diversion power station of high flood peak.
该工程为高水头迳流引水式电站。
8.
Elementary Discussion of the Penstock Anchorage Block Design of High-head Hydropower Station
浅谈高水头水电站压力钢管镇墩设计
9.
Study on Structural Characteristics of the Spiral Case of Hydropower Station Standing with High-head Water Pressure;
高水头水电站蜗壳结构受力特性研究
10.
Application of Low-voltage Lightning-proof Technology to Hydropower Stations
低压防雷技术在水电站工程中的应用
11.
Quantitative Study of Stress-release Zone of Low-elevation Slope in a Certain Hydroelectric Station
某水电站低高程岸坡卸荷带量化研究
12.
Technical Alteration of the CT-40 Mechanical Hydraulic Governor in the Shitouhe Hydropower Station;
石头河水电站CT-40型调速器技术改造
13.
Excavation and Construction of Extra Large Caverns at Longtoushi Hydropower Station
龙头石水电站特大洞室开挖施工技术
14.
Research of Interfere between Turbines in a Hydroelectric Power Station with High Head and Long Head Race Tunnel;
高水头引水式水电站机组之间干扰问题研究
15.
Water Turbine Design for Hydropower Station with High Water Head in Sedimentladen River
浅析高水头多沙河流水电站水轮机的设计
16.
Discussion on Indicatrix of Displacement Observation Accuracy of Both the Anchorage Block and the Buttress in High-Head Diversion Power Plant
高水头水电站镇支墩位移观测精度指标的研讨
17.
Discussion on energy dissipation design for hydropower station at high head and large discharge
大流量高水头水电站泄洪消能设计的探讨
18.
Experimental study on shape optimization of three-in-one diversion tunnel in high-head hydropower station
高水头水电站“三洞合一”布置的体型优化试验