1) low head hydro power station
低水头水电站
2) low water head power station
低水头电站
1.
Large amount of excavating quantity of a project can be decreased by optimizing the design of surge chamber of low water head power station.
低水头电站调压室优化设计可以节省较大工程量 ,采用特征线法对一实际工程引水发电系统进行了数学模拟和稳定性计算分析 ,指出水电站引水发电系统稳定性由调压室断面积和机组调速器共同决定 ,调速器参数整定合适时 ,低水头电站调压室断面积可以采用小于托马公式计算所得的面积。
3) run-of-river power station
低水头径流式水电站
1.
This article introduces the metal structure layout and design of flood-releasing sluice,power house,and boat lock of Rongjiang Guding power station and expounds the design thought of every part of metal structure in the run-of-river power station.
文章介绍了融江古顶水电站泄洪闸坝、发电厂房、船闸3个部分的金属结构布置及设计,阐述了低水头径流式水电站中各部分金属结构的布置设计思路。
4) Hydropower plants with low head and high flow
低水头大流量电站
6) Pingtou hydropower station
坪头水电站
1.
Based on Q-type cluster analysis of 18 water samples of karst-water system in Pingtou hydropower station,the paper draws hierarchical cluster graph.
该文以坪头水电站为例,对厂址区的18个水样进行Q型聚类分析,绘制出聚类分析谱系图。
2.
The ancient landslide of Ergu groove– Wanbo groove,which is located on the banks of site areaⅢdistrict at Meigu Pingtou hydropower station , is a deep oblique bedding rock slide.
尔古沟-万波沟古滑坡位于美姑河坪头水电站厂址区Ⅲ区岸坡上,为一斜向顺层深切岩质滑坡。
补充资料:水电站额定水头
水电站额定水头
design head of hydro-power station
小,造成较大的受阻容量.这就须增加电力系统的装机容黄,从而付出经济代价。若倾定水头减小,则在水轮发电机组额定容量不变时,需加大水轮机直径和相应降低机组转速,使水轮发电机组重量增加,从而增加水电站的建设费用。 水电站额定水头一般略低于加权平均水头,有时为了多获得季节性电能,也可考虑在水轮机直径和转速不变的情况下,适当提高水电站额定水头,以加大发电机容量。 水电站额定水头、预想出力及受阻容t示意图见图。shu一d旧nzhon ed一ng shu一tou水电站额定水头(design head of hydropowerstatinn)机组额定容t相应的最小水头。也称临界水头。它是水电站重要的特征水头。水轮机的过水能力与水头平方根成正比,水头愈高,水轮机的轴出力也愈大,在某一水头时,水轮机最大可能的轴出力叫做水轮机水头预想出力,或简称为预想出力。但水轮发电机组的出力,还受发电机容t的限制,因此水轮发电机组的水头预想出力,应为水轮机水头预想出力与发电机容t两者之较小者。当水电站工作水头小于机组额定水头时,机组水头预想出力小于机组额定容量,其不足部分叫受阻容量. 水电站额定水头的选择是一个技术经济问题。若倾定水头较高,当水电站水库消落深度(即正常蓄水位与死水位的高程差)较大时,或低水头电站汛期出现大流t,下游水位大幅度抬高时,都将使水头大幅度减┌─┬─┐│ │ │└─┴─┘预娜出力里阻容t水电站额定水头、预想出力及 受阻容t示意图
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条