1) Xiaowan hydropower station
小湾电站
1.
Stability analysis of high inlet slope for Xiaowan Hydropower Station;
小湾电站进水口高边坡稳定性研究
2.
In the Feasibility Report of Xiaowan Hydropower Station,construction schedule will be much slowed down due to more orifices in the dam body,reservoir filling will start 12 years later after the construction of reservoir has begun.
小湾电站可行性报告中,坝身布置的孔口大多,影响施工速度;由于大坝施工进度慢,水库在开工后的第12年汛期才能开始拦蓄洪水。
3.
Prior to the joint grouting work of the Xiaowan hydropower station,we conduct indoor and On-site slurry performance tests which provide scheme and basis for the construction.
45:1水灰比浆液对小湾电站横缝进行接缝灌浆,取得了很好的效果。
2) Xiaowan hydropower project
小湾电站
1.
In this paper, coupling of stress and seepage fields at the damsite area of the Xiaowan hydropower project is analyzed, and the fractal effect of rock fractured surface on the seepage flow in fractured rock masses is studied by means of numeric simulation of single fracture permeability.
本文研究了小湾电站坝址区岩体渗流场与应力场的耦合相互作用 ,并结合右坝肩F1 1 断层的特性 ,探讨了裂隙内具有不同填充物情况下 ,裂隙表面分形对裂隙渗流和应力的影响。
2.
To solve the powerhouse intake high slope stability problem for the Xiaowan Hydropower Project a further comprehensive study was made based on the results of rock mass classification, sampling of soft seams, test and analysis, shearing plane network simulation and slope stability limit analysis developed in the early stage study .
围绕小湾电站厂房进口高边坡的稳定性问题 ,利用前期研究中开发的岩体分类、软弱夹层的取样、试验和分析方法、结构面网络模拟、边坡稳定的极限分析等成果 ,在进一步发展完善的基础上进行了综合研究。
3) Xiaowan Hydropower Station
小湾水电站
1.
Practice of Project Environmental Supervision System at Xiaowan Hydropower Station;
工程环境监理制度在小湾水电站的实践
2.
Regression analysis of 3D initial geostress field for dam site of Xiaowan Hydropower Station;
小湾水电站坝址区三维初始地应力场反演回归分析
3.
Discussion on abrasion-resistant concrete mixing ratio for construction of water cushion pond of Xiaowan Hydropower Station;
小湾水电站水垫塘抗冲耐磨混凝土配合比的讨论与施工
4) Xiaowan hydropower project
小湾水电站
1.
Consolidation grouting features of dam foundation and construction quality control for Xiaowan hydropower project;
小湾水电站坝基固结灌浆特点和施工质量控制
2.
Design of concrete mixing plant on left bank for Xiaowan hydropower project;
小湾水电站左岸混凝土拌和系统设计
3.
Study of Powerhouse Intake Vertical High Slope Monitoring and Information Feedback for Xiaowan Hydropower Project;
小湾水电站进水口高边坡监测及信息反馈研究
5) Xiaowan Hydropower Station
小湾水电站工程
1.
Summary on the Excavation Method of Underground Cavern Chamber of Xiaowan Hydropower Station
小湾水电站工程地下洞室开挖方法小结
补充资料:大亚湾核电站
大亚湾核电站 中国90年代兴建的规模最大的核电站。位于广东省大亚湾畔的大坑村。由广东核电投资有限公司和香港核电投资有限公司合资建设,1984年4月动工。电站范围198万平方米,厂区占地63.5万平方米,反应堆采用法国制造的2台900兆瓦压水堆,90 厘米厚的预应力钢筋混凝土密闭安全壳可承受 5个大气压。电站装有2套各900兆瓦的汽轮发电机组,年发电量可达 100亿千瓦时。电站投产后,70%的电力供应香港,30%供应广东。1号机组于1993年8月21日并网发电,1994年2月投入商业运行。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条